My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01020 - 4/11 <br /> <br />Item 4: <br />Testing, Surveying, and Miscellaneous / LS: This item shall cover all testing including <br />but not limited to compaction test/densities, string-lining, boarding, asphalt core samples <br />and concrete core testing. This item shall also include all land surveying and layout <br />services required for the project. This item shall also include miscellaneous expenses <br />such as, but not limited to, reproduction services, As-Built Plans (in CAD format), meetings <br />with the City, Engineer of Record, the County, Florida Department of Transportation or <br />other governing entities, delivery services, etc. as needed to complete the project. <br />Measurement for payment shall be based on the percentage of work completed from <br />Notice to Proceed to Final Approval by the City as determined by the City. <br /> <br />Item 5: <br />Indemnification Allowance / LS: <br />The indemnification provided above shall obligate the contractor to defend at his own <br />expense or to provide for such defense, at the city option, any and all claims of liability and <br />all suits and actions of every name and description that may be brought against the City <br />excluding only those which allege that the injuries arose out of the sole negligence of the <br />city, which may result from the operations and activities under this contract whether the <br />construction operations be performed by the contractor, his subcontractor or by anyone <br />directly or indirectly employed by either. <br />Payment of the said specific consideration shall be made at the same time of the payment <br />of the first progress estimate and the contractor shall acknowledge payment of this <br />consideration by letter to the Owner after receipt of the progress payment. <br /> <br />Items 6 to 14 inclusive: <br />Install FPL Conduit (material furnished by FPL) / LF: FPL will provide necessary <br />conduit for this task. CONTRACTOR responsible for coordination and acceptance of <br />deliveries. The price for these items shall include but not be limited to all labor, equipment, <br />and materials necessary to install ductbank. Complete installation includes warning tape <br />(“DO NOT DIG”) over FPL ductbank, pull strings (for 2” conduit, mule tape for larger <br />conduit), fittings, end caps and identification tags on pull lines. Also includes demolition <br />and restoration required for installation including saw cutting, asphalt removal, excavation <br />and materials removal and disposal, sheeting, shoring, bracing demucking, de-watering, <br />any measures associated with dewatering such as turbidity barrier and sediment control <br />de-watering permits. Includes removal, relocation, and/or re-establishing of existing <br />utilities included. Includes bedding material, suitable backfill material (excluding flowable <br />fill), roadway base restoration and 1” lift of type SP-9.5 Asphalt Fine Mix, sod <br />replacement, soft digs, test pits, and exploratory digging for existing utilities, repairs to <br />irrigation systems, landscape, driveway, curb and sidewalk, striping and pavement <br />markings, appurtenances and incidentals as shown on the plans and specifications and/or <br />necessary for a complete installation shall be included in the unit price for this pay item. <br />No additional compensation shall be made for changes in alignment or grade to avoid <br />existing infrastructure unless the excavation exceed ten(10) feet in depth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.