My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01020 - 6/11 <br /> <br />curb and sidewalk, striping and pavement markings, appurtenances and incidentals as <br />shown on the plans and specifications and/or necessary for a complete installation shall <br />be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of boxes installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Items18: <br />Install 30” handhole (material furnished by FPL) / EA: FPL will provide necessary <br />handholes for this task. CONTRACTOR responsible for coordination and acceptance of <br />deliveries. The price for these items shall include but not limited to all labor, equipment <br />and materials necessary to handle, store, install and construct the structure in accordance <br />with these contract documents which include but not limited to locating, verifying and <br />protecting existing utilities, excavation, removal and disposal of unsuitable material below <br />the structure. Completed installation includes sod replacement, soft digs, test pits, and <br />exploratory digging for existing utilities, repairs to irrigation systems, landscape, driveway, <br />curb and sidewalk, striping and pavement markings, appurtenances and incidentals as <br />shown on the plans and specifications and/or necessary for a complete installation shall <br />be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of handholes installed <br />in accordance with the contract documents. Payment shall be at the unit price bid per <br />each. <br /> <br />Items 19: <br />Install Transformer Pad (material furnished by FPL) / EA: FPL will provide necessary <br />concrete pads for this task. CONTRACTOR responsible for coordination and acceptance <br />of deliveries. The price for these items shall include but not limited to all labor, equipment <br />and materials necessary to handle, store, install and construct the structure in accordance <br />with these contract documents which include but not limited to locating, verifying and <br />protecting existing utilities, excavation, removal and disposal of unsuitable material below <br />the structure. Completed installation includes sod replacement, soft digs, test pits, and <br />exploratory digging for existing utilities, repairs to irrigation systems, landscape, driveway, <br />curb and sidewalk, striping and pavement markings, appurtenances and incidentals as <br />shown on the plans and specifications and/or necessary for a complete installation shall <br />be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of pads installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Items 20: <br />Install 18” x 24” Pull Boxes (material furnished by FPL) / EA: FPL will provide <br />necessary boxes for this task. CONTRACTOR responsible for coordination and <br />acceptance of deliveries. The price for these items shall include but not limited to all labor, <br />equipment and materials necessary to handle, store, install and construct the structure in <br />accordance with these contract documents which include but not limited to locating,
The URL can be used to link to this page
Your browser does not support the video tag.