My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01020 - 9/11 <br /> <br /> <br />Measurement for payment shall be based upon the actual number of handholes installed <br />in accordance with the contract documents. Payment shall be at the unit price bid per <br />each. <br /> <br />Items 34 to 36 inclusive: <br />Furnish and Install Conduit for City / LF: The price for these items shall include but not <br />be limited to all labor, equipment, and materials necessary to install ductbank. Complete <br />installation includes pull strings, fittings, end caps and identification tags on pull lines. Also <br />includes demolition and restoration required for installation including saw cutting, asphalt <br />removal, excavation and materials removal and disposal, sheeting, shoring, bracing <br />demucking, de-watering, any measures associated with dewatering such as turbidity <br />barrier and sediment control de-watering permits. Includes removal, relocation, and/or re- <br />establishing of existing utilities included. Includes bedding material, suitable backfill <br />material (excluding flowable fill), roadway base restoration and 1” lift of type SP-9.5 <br />Asphalt Fine Mix, sod replacement, soft digs, test pits, and exploratory digging for existing <br />utilities, repairs to irrigation systems, landscape, driveway, curb and sidewalk, striping and <br />pavement markings, appurtenances and incidentals as shown on the plans and <br />specifications and/or necessary for a complete installation shall be included in the unit <br />price for this pay item. No additional compensation shall be made for changes in <br />alignment or grade to avoid existing infrastructure unless the excavation exceed ten (10) <br />feet in depth. <br /> <br />Measurement for payment shall be based on the linear feet of conduit installed measured <br />as LF along the horizontal center line of the conduit installed. Payment shall be based at <br />the total unit price bid per linear foot of conduit installed. <br /> <br />Item 37: <br />Furnish and install City 24” x 13” pull box / EA: The price for these items shall include <br />but not limited to all labor, equipment and materials necessary to install and construct the <br />structure in accordance with these contract documents which include but not limited to <br />locating, verifying and protecting existing utilities, excavation, removal and disposal of <br />unsuitable material below the structure. Completed installation includes sod replacement, <br />soft digs, test pits, and exploratory digging for existing utilities, repairs to irrigation <br />systems, landscape, driveway, curb and sidewalk, striping and pavement markings, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of pull boxes installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Item 38: <br />Flowable Fill / CF: The price for these items shall include but not be limited to all labor, <br />equipment and materials necessary to provide flowable fill as backfill for ductbank within <br />roadway. This item to be used in conjuction with other pay items that involve installation of
The URL can be used to link to this page
Your browser does not support the video tag.