<br />01020 - 10/11 <br /> <br />conduit. Price includes removal and disposal of excess material generated with <br />excavation of ductbank trench. <br /> <br />Measurement for payment shall be based upon the the actual amount of flowable fill <br />placed as verified through field tickets. Payment shall be at the unit price per unit. <br /> <br />Items 39: <br />Asphalt Mill and Resurface / SY: The price for this item shall cover costs for all labor, <br />materials, equipment, and disposal required for resurfacing roadways following installation <br />of ductbank. Price includes up to 2 mobilizations and coordination with neighborhood <br />residents to avoid disruption and access to properties. <br /> <br />Measurement for payment shall be based on SY of asphalt installed. Payment shall be at <br />unit price per unit. <br /> <br />Items 40: <br />Construct Concrete Sidewalk / ALLOWANCE: The price for this item shall cover costs <br />for all labor, materials, equipment required for construction of approximately 1,100 SY of 4” <br />and 6” concrete walk, including curbing, ramps, and adjustment to drainage structures as <br />indicated in plans. Price includes complete restoration of driveways, landscape, sod, and <br />irrigation systems. <br /> <br />The actual cost of the work will be established by a negotiated price between <br />CONTRACTOR and CITY. Unless there are substantial differences in the plans, the <br />negotiated price will not exceed the allowance. Measurement for payment shall be based <br />upon percentage of work complete. <br /> <br />Item 41: <br />Urban Walkway Improvements / ALLOWANCE: The price for this item shall cover costs <br />for all labor, materials, equipment required for construction of improvements along Collins <br />Avenue as indicated in Urban Walkway plans. Price includes complete restoration of <br />landscape, sod, and irrigation systems. <br /> <br />The actual cost of the work will be established by a negotiated price between <br />CONTRACTOR and CITY. Unless there are substantial differences in the plans, the <br />negotiated price will not exceed the allowance. Measurement for payment shall be based <br />upon percentage of work complete. <br /> <br />Item 42: <br />Concrete fill over FPL Conduits / ALLOWANCE: In the event installation of FPL conduit <br />results in less than 36” of cover, it may be necessary to provide concrete gill over top. The <br />decision to do so will be at discretion of the City and Engineer. The price for this item shall <br />cover costs for all labor, materials.