My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01044 - 1/1 <br />SECTION 01044 - OPERATIONS IN ROADWAY RIGHT-OF-WAY <br /> <br />PART 1 - GENERAL <br />1.01 GENERAL <br />A. CONTRACTOR shall obtain all necessary permits not obtained by ENGINEER <br />OR OWNERS REPRESENTATIVE, and arrange all inspection required by the <br />City and shall pay all charges. <br />B. Traffic flow shall be maintained in all areas of the work. <br />C. The CONTRACTOR shall take all means necessary to prevent accidents. <br />Sufficient flagmen, barricades, lights, signs and all other precautions necessary <br />shall be furnished to provide safe conditions. <br />D. Pavement: Replace damaged or destroyed street pavement, base, and subgrade <br />in complete accordance with the requirements of the controlling authority and the <br />Contract Documents. <br />E. Refer to Section 01570 for Traffic Control Requirements. <br /> <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION (NOT USED) <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.