My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />01710 - 2/2 <br />C. Remove waste materials, debris, and rubbish from site daily and dispose of at legal <br />disposal areas away from site. <br />3.02 DUST CONTROL <br />A. Clean interior spaces before start of finish painting and continue cleaning on as- <br />needed basis until painting is finished. <br /> <br />B. Schedule operations so dust and other contaminants resulting from cleaning process <br />do not fall on wet or newly-coated surfaces. <br /> <br />C. Use periodic water spraying as required to minimize dust formation and keep dust <br />generating areas wetted down. <br /> <br />3.03 FINAL CLEANING <br />A. Employ skilled personnel for final cleaning. <br />B. Broom clean exterior paved surfaces and rake clean other surfaces of grounds. <br />C. Wash and shine glazing and mirrors. <br />D. Polish glossy surfaces to clear shine. <br />E. Ventilating Systems: <br />1 Clean permanent filters and replace disposable filters if units were operated <br />during construction. <br />2 Clean ducts, blowers, and coils if units were operated without filters during <br />construction. <br />3 Upon completion, provide two spare sets of filters to the OWNER. <br />F. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, and other <br />foreign materials from sight-exposed interior and exterior surfaces. <br />G. Before Final Completion, or OWNER occupancy, conduct inspection of sight- <br />exposed interior and exterior surfaces, and all Work areas, to verify Work is clean. <br />H. Remove paving materials and clean all castings, exiting and new after final paving is <br />completed. <br />I. Clean all drainage structures and drainage components which may have received <br />construction runoff, debris, and contaminants during construction operations. <br />J. Maintain cleaning until acceptance and occupation by the OWNER. <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.