My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15108 - 1/2 <br />SECTION 15108 - HANDHOLE AND BOXES <br />Part 1 - GENERAL <br />1.01 RELATED DOCUMENTS <br />All applicable provisions of bidding and Contract requirements including <br />Division 1 - General requirements, shall govern the work under this section. <br />1.02 SUMMARY <br />A. This Section includes handholes and, boxes, for utility conduits. <br />1.03 SUBMITTALS <br />A. Contractor shall submit shop drawings and related information to the <br />ENGINEER for approval in accordance with section 01300. <br />Part 2 - PRODUCTS <br />2.01 HANDHOLES AND BOXES DESCRIPTIONS FOR UNDERGROUND <br />CONDUITS <br />A. Configuration: Units shall be designed for flush burial and have <br />integral closed bottom, unless otherwise indicated <br />B. Cover: Weatherproof, secured by tamper-resistant locking <br />devices and having structural load rating consistent with <br />enclosure. <br />C. Cover Finish: Nonskid finish as per detail plans <br />D. Cover Legend: Molded lettering bearing the utility name <br />E. Conduit Entrance Provisions: Conduit-terminating fittings shall mate with <br />entering ducts for secure, fixed installation in enclosure wall. <br />F. Handholes minimum 12 inches wide by 24 inches long (300 mm wide by <br />600 mm long) and larger shall have inserts for cable racks and pulling-in <br />irons installed before concrete is poured. All handholes shall be in <br />accordance with the sizes called for and shown on the construction plans. <br />G. All shall be minimum H20 load rated.
The URL can be used to link to this page
Your browser does not support the video tag.