My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15108 - 2/2 <br />2.02 SOURCE QUALITY CONTROL FOR UNDERGROUND ENCLOSURES <br />A. Handhole and Pull-Box Prototype Test: Test prototypes of handholes and <br />boxes for compliance with SCTE 77. Strength tests shall be for specified <br />tier ratings of products supplied. <br />B. Tests of materials shall be performed by a independent testing agency. <br />C. Strength tests of complete boxes and covers shall be by either an <br />independent testing agency or manufacturer. A qualified registered <br />professional engineer shall certify tests by manufacturer. <br />Part 3 EXECUTION <br />3.01 INSTALLATION OF UNDERGROUND HANDHOLES AND BOXES <br />A. Install handholes and boxes level and plumb and with orientation and <br />depth coordinated with connecting conduits to minimize bends and <br />deflections required for proper entrances. <br />B. Unless otherwise indicated, support units on a level bed of crushed stone <br />or gravel, graded from 1/2-inch (12.5-mm) sieve to No. 4 ) sieve and <br />compacted to same density as adjacent undisturbed earth. <br />C. Elevation: In paved areas, set so cover surface will be flush with finished <br />grade. <br />D. Field-cut openings for conduits according to enclosure manufacturer's <br />written instructions. Cut wall of enclosure with a tool designed for <br />material to be cut. Size holes for terminating fittings to be used, and seal <br />around penetrations after fittings are installed. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.