My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16132 - 1/3 <br />SECTION 16132 - PRECAST MANHOLE <br /> <br />PART 1 - GENERAL <br />1.01 RELATED DOCUMENTS <br />A. All applicable provisions of Bidding and Contract Requirements <br />including Division 1 - General Requirements, shall govern the work <br />under this section. <br />1.02 WORK INCLUDED <br />A. Provide all labor, materials, necessary equipment and services to <br />complete the pre-cast manholes work," as indicated on the drawings, as <br />specified herein or both, except as for items specifically indicated as "NIC <br />ITEMS". <br />1.03 RELATED WORK <br />A. Section 02200 - Earthwork. <br />B. Section 15108 –Handhole and Boxes <br />1.04 SUBMITALS <br /> A. Submit shop drawings and product data in accordance with Section <br />1300. <br />1.05 DESCRIPTION <br />A. Provide precast manholes include excavating and backfilling as necessary <br />for a complete installation in accordance with drawings and specifications. <br />1.06 QUALITY ASSURANCE <br />A. The work shall be performed in accordance with the drawings. <br />Earthwork shall be in accordance with Section, EXCAVATING, <br />TRENCHING AND BACKFILLING FOR UTILITIES in Division 2. <br />1.07 COORDINATION <br />A. Prior to beginning trenching operations, exact locations and clearances <br />for all pre-cast manholes shall be established. Adjust position of <br />underground utilities or adjust runs as necessary for proper location and <br />installation.
The URL can be used to link to this page
Your browser does not support the video tag.