My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:15:22 PM
Creation date
12/1/2021 12:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />SEVEN <br />21. TITLE AND LOCATION (City and State) <br />School District of Palm Beach County - West Technical Education Center <br />Programming & Building Conditions Assessment & Report Belle Glade, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2021 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER <br />School District of Palm Beach County <br />B. POINT OF CONTACT NAME <br />Jorge Fuentes, Architectural Project Manager <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />561-655-2423 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />PROJECT SCOPE <br />OCI Associates was selected as a sub-consultant to an Architectural firm to <br />provide a Due Diligence Report and Building Conditions Assessment of a <br />education center in Belle Glades. Our team members were required to provide a <br />site visit to the building and evaluate the following systems; <br /> · Mechanical Systems <br /> · Electrical Systems <br /> · Plumbing Systems <br /> · Fire Protection Systems <br /> · Low Voltage Systems <br />After the evaluation, our team provided a report of findings such as the general <br />condition, MEP engineer’s opinion of overall serviceability and longevity as well <br />as our recommendation for remedial repair or a completed replacement of the <br />systems and a probable cost estimate. The report was provided to the School <br />District of Palm Beach County for them to determine the future needs of using <br />the space for their employees. <br />ROLE <br />Mechanical, Electrical, Plumbing & Fire Protection Engineering Assessment <br />KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection* <br />(*)The key team members from this project will be assigned to your contract <br />a.(1) FIRM NAME <br />OCI Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />Maitland, Florida <br />(3) ROLE <br />MEP/FP/ITS/AV Engineering <br />b. <br />(1) FIRM NAME <br />OCI Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />West Palm Beach, Florida <br />(3) ROLE <br />Project Management + Electrical <br />Engineering <br />PROJECT RELEVANCY <br />✓MEP/FP/ITS Systems Evaluation <br />✓Due Diligence Report <br />✓Existing Facility
The URL can be used to link to this page
Your browser does not support the video tag.