My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:15:22 PM
Creation date
12/1/2021 12:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />TEN <br />21. TITLE AND LOCATION (City and State) <br />Florida Highway Patrol Troop D Station Facility Assessment <br />Orlando, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER <br />Florida Highway Patrol <br />B. POINT OF CONTACT NAME <br />Christopher Sorvillo, Captain <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />954-914-3515 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />PROJECT SCOPE <br />OCI Associates was selected as a sub-consultant to an Architectural firm to <br />provide a Due Diligence Report and Building Conditions Assessment of a 10,400 <br />SF headquarters building roof replacement. Our team members were required <br />to provide a site visit to the building and evaluate the following systems; <br /> · Lightning Protection Evaluation of the existing Mechanical Systems <br />After the evaluation, our team provided a report of findings such as the general <br />condition, MEP engineer’s opinion of overall serviceability and longevity as well <br />as our recommendation for remedial repair or a completed replacement of <br />the systems and a probable cost estimate. The report was provided to Florida <br />Highway Patrol for them to determine the future needs of using the space for <br />their employees. <br />With Department of management Services (DMS). Cocoa HQ Building Roof <br />Replacement 10,400 SF Existing building needs a lightening protection <br />evaluation of existing mechanical systems, a report of findings such as general <br />condition, MEP engineer’s opinion of overall serviceability/longevity as well as <br />recommendation for remedial repair or replacement. <br />ROLE <br />Mechanical, Electrical, Plumbing & Fire Protection Engineering Evaluations <br />KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Jason Diehl | Senior Mechanical Engineer* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* <br />(*)The key team members from this project will be assigned to your contract <br />a.(1) FIRM NAME <br />OCI Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />Maitland, Florida <br />(3) ROLE <br />Lightning Protection Engineering <br />b.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />PROJECT RELEVANCY <br />✓Lightning Protection Evaluation <br />✓Due Diligence Report <br />✓Existing Commercial Facility
The URL can be used to link to this page
Your browser does not support the video tag.