My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-10-01) Space Needs Assessment Feasibility Study (CCNA)
>
RESPONSES
>
CPZ Architects Submittal RFQ 21-10-01 11-29-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 12:15:22 PM
Creation date
12/1/2021 12:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 4 <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />21. TITLE AND LOCATION (City and State) <br />Apotex Florida Expansion – Phases A, B and C <br />Miramar, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />N/A <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Apotex, Inc. <br />Toronto, Canada <br />b. POINT OF CONTACT NAME <br />Dwight Trotter/Global Director, Capital <br />Engineering <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />1-800 268-4623 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) <br />Description: Interior buildout of the existing facility by adding another floor. Apotex Inc., the largest Canadian-owned <br />pharmaceutical company, will create 150 full-time jobs in Broward County as part of a $184 million U.S. expansion. The <br />company is developing a new research and development center and an advanced manufacturing and packaging facility in <br />Miramar, which will serve as the U.S. headquarters for Apotex and offices for Apobiologix. Its U.S. offices are currently in <br />Weston. Construction of the facility began in 2017 and is expected to be completed in early 2019. <br /> <br />Size: Project Site Size = 165,400 SF <br /> <br />Cost: $24,999,989.00 <br /> <br />Scope of Work: Construction Documents Cost Estimating <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />CMS-Construction Management <br />Services, Inc. <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br />10 Fairway Drive <br />Suite 301 <br />Deerfield Beach, FL 33441 <br /> <br />(3) ROLE <br />Cost Estimating <br /> <br /> <br />b. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br /> <br /> <br />(3) ROLE <br /> <br /> <br /> <br />c. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.