Laserfiche WebLink
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 6 <br /> <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />21. TITLE AND LOCATION (City and State) <br />City of Coral Springs – Westside Maintenance Facility <br />Coral Springs, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Coral Springs, FL <br />c/o CPZ Architects, Inc. <br /> <br />b. POINT OF CONTACT NAME <br />Mr. Chris P. Zimmerman, AIA <br />President <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(954) 792-8525 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) <br /> 2014: Description: This project involved three Phases for the construction of a new Central Stores/Offices Building, a new <br /> Vehicle Maintenance Facility, and a new Parking Lot. <br />Phase I – Construction of a new Central Stores/Offices (including Site Work) <br />Phase II – Construction of a new Vehicle Maintenance Facility (including Site Work) <br />Phase III – Construction of a new Parking Lot (including Site Work) <br /> Size: Vehicle Maintenance Facility = 16,900 SF; Central Stores/Offices Building Size = 17,7341 SF; Parking Lot = 27,345 SF <br /> <br />Cost: Central Stores/Offices = $2,724,852.00; Maintenance Facility = $4,506,840.00; Parking Lot = $728,080.00 <br /> <br />Specific Role: Order of Magnitude Cost Estimating <br /> <br />2018 -2020: CMS was asked again by CPZ Architects, Inc. of Plantation, Florida to provide an Order of Magnitude <br />Cost Estimate for Coral Spring’s Westside Maintenance Facility Master Plan project which involved the interior <br />demolition and buildout of the existing 50,026 SF, one-story Maintenance Facility, by the addition of a 26,000 SF <br />second story. Also, included is sitework, utilities, lighting, paving, and landscaping. <br /> <br />• Scope of Work: Order of Magnitude (2018) / Construction Documents Cost Estimating (2019-2020) <br /> <br />• Total Probable Cost: $28,471,800.00 <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME CMS-Construction Management <br />Services, Inc. <br /> <br /> <br />(2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301 <br />Deerfield Beach, FL 33441 <br />(3) ROLE Cost Estimating <br /> <br /> <br />