Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Tamarac Water Treatment Building <br />City of Tamarac <br />The main goals of the project were to have a new two-story Administrative Building of approximately 12,500 sq ft designed as an “Essential Facility” and to meet “LEED standards” taking advantage of natural lighting and introducing Solar Energy Systems. This Building contains Labs and a Control Room that overlooks the plant operations and is proposed to be directly connected to the tanks and filtrations systems through overhead walkways/ bridges. In addition to the main Administrative building CPZ will assist Engineering consultants in designing the exteriors for new Motor Control, Fluoride and NaOCL Buildings on the site. The city wanted to redevelop the entire site with new building structures for the Administration offices and several accessory buildings to the Water Treatment plant in a way that its operation is not affected during construction. Therefore the project is designed to be built in two phases: 1.The new building will be built on a location that does not require the demolition of the existing infrastructure in Phase 1. 2.The Existing Building will be demolished and Site work will begin as all operations transfer to new Admin Building. The location of the project in proximity to residential neighborhoods of the City of Tamarac gives and excellent opportunity for the project to be designed as a City Landmark that incorporates the building elements of the City’s existing architecture. <br />8 <br />2019 2022 <br />Ron Stein 954-597-3716 <br />CPZ Architects Plantation, Florida Architect <br />Eckler Engineering Water Treatment, Water Distribution <br />WGI Structural, MEP, Civil LandscapeArchitecture <br />Terracon Consulting Fort Lauderdale, Florida Geotechnical <br />Avirom & Associates Boca Raton, Florida Survey <br />CMS Deerfield Beach, Florida Cost <br />Coral Springs, Florida <br />West Pallm Beach, Florida