Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />THREE <br />21. TITLE AND LOCATION (City and State) <br />Department of Military Affairs West Palm Beach District Court of Appeal <br />Renovation, Due Diligence Report and Assessment, Palm Beach, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (If applicable) <br />Current <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER <br />Department of Military Affairs <br />B. POINT OF CONTACT NAME <br />Sebastian Velazquez Feliu, Project Manager <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />561.655.2423 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />PROJECT SCOPE <br />OCI Associates was selected as a sub-consultant to an Architectural firm to <br />provide a Due Diligence Report and Building Conditions Assessment of the <br />existing District Court of Appeal building. Our team members were required to <br />provide a site visit to the building and evaluate the following systems; <br /> · Mechanical Systems <br /> · Electrical Systems <br /> · Plumbing Systems <br /> · Fire Protection Systems <br /> · Low Voltage Systems <br />After the evaluation, our team provided a report of findings such as the general <br />condition, MEP engineer’s opinion of overall serviceability and longevity as well <br />as our recommendation for remedial repair or a completed replacement of the <br />systems and a probable cost estimate. The report was provided to the Owner; <br />and led the team to move forward with a new job order from the Owner to <br />renovate the existing space into a Readiness Center for the US National Guard; <br />which OCI is currently designing the new replacement systems for the project. <br />ROLE <br />Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment <br />KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Sudharma Wijegunawardana, PE, LEED AP, LC. | Project Manager + Electrical <br />Engineer of Record · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record · Jason Diehl | Senior Mechanical Engineer · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection · Nick Wilkie, Plumbing & Fire Protection <br />The key team members from this project will be assigned to your contract <br />a.(1) FIRM NAME <br />OCI Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />Maitland, Florida <br />(3) ROLE <br />MEP/FP/ITS/AV Engineering <br />b. <br />(1) FIRM NAME <br />OCI Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />West Palm Beach, Florida <br />(3) ROLE <br />Project Management + Electrical <br />Engineering <br />PROJECT RELEVANCY <br />✓Justice Center <br />✓Secure Facility <br />✓Federal Government Owner <br />✓MEP/FP/ITS Systems Evaluation <br />✓Due Diligence Report <br />✓Existing Government Facility