My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3337
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2022 6:48:43 PM
Creation date
6/3/2022 9:25:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3337
Date (mm/dd/yyyy)
05/19/2022
Description
Agmt w/Keith & Assoc., Inc., New Structure @ 15800 Collins Ave., f/k/a/ Ritz Sales Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6, 2022 / Page 4 of 12 <br />11723.02 — New Park at Ritz Carlton Sales Center Site <br />City of Sunny Isles Beach <br />The borings will be drilled utilizing the rotary wash method with a truck -mounted drill rig. Samples <br />of the subsurface materials encountered will be collected continuously down to 10 feet below <br />ground surface. Below that depth the sampling will be performed at roughly 5 -foot intervals. <br />Sampling,will be performed using a Standard Penetration Test (SPT) sampler per ASTM D-1586. <br />Upon completion of the borings, the boreholes will be grouted to the ground surface. <br />2. In addition to the borings, we propose performing two (2) field permeability tests to provide <br />information for drainage design at the site. The tests will be performed to 15 feet below the . <br />existing grade in general accordance with the South Florida Water Management District's Usual <br />Open Hole Procedure. Upon completion of the tests, the boreholes will be abandoned with grout <br />to the ground surface. Test locations can be coordinated with the project civil engineer as <br />appropriate. <br />3. For performing the fieldwork, NV5 will contact Sunshine One Call for advice about the location of <br />underground utilities. Additionally, we require that any other available information regarding the <br />location of underground utilities be provided to us. NV5 cannot be held responsible for damage <br />to below ground structures or utilities that are not identified to us. We specifically request any <br />available information about the location of underground utilities for this project. <br />4. An NV5 representative will layout test locations based on the furnished drawings. NV5 will <br />perform borings in areas that are indicated to be free from underground utilities. <br />5. We note that the site is an active facility. We will rely on the client to provide all necessary site <br />contact information for NV5 to efficiently execute the field work. Site contact name and contact <br />information will be required prior to starting our field work. While NV5 will make reasonable <br />efforts to minimize disruption to any site daily activities, it should be understood that NV5 could <br />need to occupy parking and drive areas for execution of the work. Additionally, drilling is an <br />inherently noisy and messy operation. While NV5 will make reasonable efforts to clean the drill <br />locations upon completion of the work, some soil residue could remain at the ground surface. It <br />is our experience that such soiling is typically washed away by rain showers over time. <br />6. Based on our field data we will perform engineering analyses and prepare an engineering report <br />with evaluations and discussions of the geotechnical aspects of the proposed development, and <br />provide geotechnical recommendations for design and construction. Specifically, the report will <br />provide: <br />• Drawings showing test locations, a graphic summary of the generalized subsurface conditions, <br />and boring logs with detailed descriptions of the materials encountered. <br />• Discussion of generalized subsurface conditions at the site including groundwater including <br />hydraulic conductivity. <br />• Discussion of feasible foundation type(s) for the proposed construction. <br />• Design parameters for the recommended foundation type, including vertical and lateral load <br />resistance. <br />• Estimates of foundation settlements. <br />• Modulus of subgrade reaction for any slabs on grade. <br />• Recommendations for pavement thickness design <br />• Recommendations for site preparation and grading, including the re -use of site -excavated <br />materials for fill, fill placement and compaction, and slab and pavement subgrade preparation. <br />Engineering Inspired Design. 523 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.