Laserfiche WebLink
April 6, 2022 / Page 6 of 12 <br />11723.02 — New Park at Ritz Carlton Sales Center Site <br />City of Sunny Isles Beach <br />KEITH shall attend one (1) coordination meeting with the CITY and City's Planning and Development <br />Services Department to review the preliminary design, code and integration of the design with existing <br />conditions (including utilities/trees/etc.) and environmental impacts of the project. KEITH will <br />coordinate with the CITY and other team members in the preparation of plans to avoid conflicts <br />between disciplines. <br />KEITH shall coordinate, prepare for and attend meetings with Government Agencies, including project <br />orientation meetings for base -line design agreements, review with City Planning, Zoning, Fire <br />Marshall, Engineering, and Utility representatives, and coordinate with applicable State, and County <br />Agencies required for final permit submittals. <br />Deliverables <br />1. Preliminary Engineering / Design Development Plans. <br />2. Preliminary Water, Sanitary Sewer and Drainage Calculations as required. <br />3. Meetings and Team Coordination — During the specified duration in the project schedule, <br />the KEITH team will attend up to three (3) required meetings and coordination. It is <br />assumed all meetings will be in South Florida. <br />Task 402 Engineering Construction Documents (CD) <br />On-site Paving, Grading, and Drainage Plans <br />KEITH shall prepare on-site paving, grading, and drainage construction plans, to support the proposed <br />development, that meet the requirements of the jurisdictional regulatory agencies. Calculations shall <br />be performed to address the impacts of the proposed development relating to the requirements for permit <br />agency submittal. The stormwater management system will address water quality treatment and water <br />quantity storage to meet the requirements of the jurisdictional agencies. It is anticipated that the <br />proposed drainage system will consist of a series of catch basins, pipes, swales and perhaps <br />exfiltration trenches. Typical sections and standard paving and drainage details and notes for the <br />construction of the paving, grading, and drainage system are included. Soils percolation tests to satisfy <br />regulatory agency requirements will be performed by the geotechnical subconsultant (NV5). <br />Off-site roadway improvements, other than direct driveway connections, are not included in this scope <br />of work. <br />On-site Pavement Marking & Signing Plans <br />The CONSULTANT shall prepare a signing and pavement marking plan for the project that meets the <br />requirements of the regulatory agencies. This plan shall include standard details and notes. <br />On-site Water Distribution and Sanitary Sewer Plans <br />KEITH shall prepare combined water distribution and sanitary sewer system plans to service the <br />proposed improvements. It is assumed that the existing domestic/irrigation/fire services and sanitary <br />sewer services are adequate and have sufficient capacity to provide service to the new park site. Off- <br />site water and/or sanitary sewer improvements (including new water meters) are not included in the <br />scope of work. North Miami Beach (NMB) Utilities is the water service provider and Miami -Dade Water <br />and Sewer Department (MDWASD) is the sanitary sewer service provider. <br />Erosion Control Plan <br />KEITH shall prepare an Erosion Control Plan for the project that meets the requirements of the <br />regulatory agencies and for the Contractor's use in preparing and processing the required Stormwater <br />Pollution Prevention Plan (SWPPP), in compliance with the "Generic Permit for Stormwater Discharge <br />from Large and Small Construction Activities (CGP)" through FDEP. The Erosion Control Plan(s) shall <br />include standard details and notes to meet the requirements of the regulatory agencies. <br />0 Engineering Inspired Design. 525 <br />