Laserfiche WebLink
April 6, 2022 / Page 8 of 12 <br />11723.02 — New Park at Ritz Carlton Sales Center Site <br />City of Sunny Isles Beach <br />ELECTRICAL ENGINEERING DESIGN SERVICES <br />(By Electrical Sub. - SGM Engineering) <br />Refer to Exhibit `B' — SGM Engineering (Sub -Consultant) Electrical Engineering Services Scope and <br />Fees. <br />Task 501 Electrical Construction Documents (CD) <br />(By Electrical Sub. - SGM Engineering) <br />The electrical subconsultant (SGM) will provide electrical engineering services for the design documents <br />of the new lighting system to illuminate the new pickle ball and multi -sports courts for the Ritz Carlton <br />Sales Center Park located in the City of Sunny Isles Beach in Florida. <br />The following elements will be addressed in the design phase: <br />1. Visit the site where the new courts are going to be installed to investigate and survey the following <br />conditions of the area: <br />a. Record all existing electrical utilities in the area that are required to be removed or relocated to <br />make space for the new courts. <br />2. Provide design for new electrical underground branch circuits (conduit and wire) for the sports court <br />lighting poles added to the pickle ball and multi -sports courts. <br />3. Provide lighting fixture schedules for all sports lighting. <br />4. Provide selection of code complaint (wind load) parking lot poles with associated bases and <br />underground boxes. <br />5. Provide new panelboards and circuit breakers at existing buildings for source of power for all lighting <br />fixtures and irrigation equipment. <br />6. Design documents will include electrical book of construction specifications. <br />LEED administration or design services are,not included in this proposal. These services can be <br />provided by SGM at additional cost. <br />LANDSCAPE ARCHITECTURE SERVICES <br />Task 701 Preliminary Landscape / Design Development Plans <br />KEITH will prepare for the approval of the Client the Preliminary Landscape Plans. The purpose of this <br />task is to work collaboratively with the design team to finalize the optimum arrangement of all program <br />and site design elements. These drawings will be in sufficient detail for submittal to the City's Planning <br />and Development Services Department for review and approval of the preliminary design. The following <br />elements will be addressed in the Preliminary / Design Development phase: <br />1. Site program <br />a. Landscape treatment and design approach for each development zone, including <br />refinement of design concepts for all outdoor spaces. <br />b. Hardscape and vehicular treatments. <br />c. Pedestrian circulation and access issues identified in conceptual programming. <br />Deliverables <br />1. KEITH will develop drawings, plans, sections and other information to describe the nature, <br />quality, and scope of site elements of the project. <br />2. KEITH will furnish the design development submittal, which will be sufficient detail for Site <br />Plan Submittal for Landscape. This submittal also includes a revision for response to City <br />Comments. Changes to the plan due to other disciplines are not included. <br />a) Landscape Plan — Specification, quantity, layout, notes and details. <br />Engineering Inspired Design. 527 <br />