My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3334
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:50:11 AM
Creation date
6/3/2022 9:27:23 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3334
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Keith & Associates, INc. d/b/a Keith, to provide Civil Engineering & Landscape Architectural Svcs for Bella Vista Bay Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 12 of 14 <br />11723.04 — Bella Vista Park <br />City of Sunny Isles Beach <br />Subsequent to the issuance of a Purchase Order from the CITY, CONSULTANT shall commence <br />work on the project. We anticipate commencing work within 5 business days from notice to proceed, <br />completing the prescribed work within six (6) months. <br />Table 1 Schedule Estimate of Services <br />TASK <br />DURATION <br />6 weeks <br />Task 101 - Boundary and Topographic Survey <br />Task 102 — Mean High Water Survey (Optional Service) <br />6 weeks <br />Task 103 Existing Easement Research (By Subconsultant - Paramount <br />Title Services) — Optional Services <br />4 weeks <br />Task 201 - SUE Horizontal Designation Services <br />Concurrent <br />with Task 101 <br />Task 202 - SUE Location Services <br />2 weeks <br />Task 203 - SUE - Utility Mapping <br />Concurrent <br />with Task 202 <br />Task 204 - Geotechnical Testing and Reporting (NV5 — Geotech Sub.) <br />Concurrent <br />with Task 401 <br />Task 301 - Site Plan Preparation and Processing <br />2 months <br />Task 401 - Preliminary Engineering / Design Development Plans <br />1 month <br />Task 402 - Engineering Construction Documents <br />3 months <br />Task 403 - Engineering Permitting <br />2 to 3 months <br />Task 501 - Electrical Construction Documents (CD) (SGM Engineering - <br />Concurrent <br />Electrical Sub.) <br />with Task 401 <br />Task 601 - Structural Construction Documents (CD) and Permitting — New <br />Seawall Trident — Structural / Environmental Sub. <br />6 months <br />Task 701 - Preliminary Landscape / Design Development Plans <br />Concurrent <br />with Task 401 <br />Task 702 - Landscape Construction Documents <br />Concurrent <br />with Task 402 <br />Engineering Inspired Design. 439 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.