My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3334
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:50:11 AM
Creation date
6/3/2022 9:27:23 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3334
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Keith & Associates, INc. d/b/a Keith, to provide Civil Engineering & Landscape Architectural Svcs for Bella Vista Bay Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mark Castano <br />Keith <br />Proposal for Geotechnical Study - Proposed Bella Vista Park <br />March 30, 2022 <br />Page 3 <br />NV5 Proposal No. 22-O3O0REV1 <br />3. For performing the fieldwork, NV5 will contact Sunshine One Call for advice about the location <br />of underground utilities. Additionally, we require that any other available information regarding <br />the location of undeuyound utilities be provided to us. NV5 cannot be held responsible for <br />damage to below ground structures or utilities that are not identified to us. We specifically <br />request any available information about the location of underground utilities for this project. <br />4. An NV5 representative will layout test locations based on the furnished drawings. NV5 will <br />perform borings in areas that are indicated to be free from underground utilities. <br />5. Based on our field data we will perform engineering analyses and prepare an engineering <br />report with evaluations and discussions of the geotechnical aspects of the proposed <br />development, and provide geotechnical recommendations for design and construction. <br />Specifically, the report will provide: <br />• Drawings showing test locations, a graphic summary of the generalized subsurface <br />conditions, and boring logs with detailed descriptions of the materials encountered. <br />• Discussion of generalized subsurface conditions at the site including groundwater <br />including hydraulic conductivity. <br />• Discussion of feasible foundation type(s) for the proposed construction. <br />• Design parameters for the recommended foundation type, including vertical and lateral <br />load resistance, including recommendations for driven piling for the bulkhead and dock. <br />• Estimates of foundation settlements. <br />• Modulus of subgrade reaction for any slabs on grade <br />• Design parameters for sheet piles including unit weight, angle of internal friction, and earth <br />pressure coefficients <br />• Recommendations for site preparation and grading, including the re -use of site -excavated <br />materials for fill, fill placement and compaction, and slab and pavement subgrade <br />preparation. <br />• Construction considerations including excavation support and dewatering, impacts of <br />existing foundations, and impacts for adjacent structures. <br />The report will be signed electronically and sealed by a professional engineer licensed in the State of <br />Florida. <br />COMPENSATION <br />We can complete the scope of services proposed herein for a lumpsum fee of $5,250. The fee <br />assumes access to the test locations will be provided at no cost to us and that the test locations can <br />be accessed with a regular truck -mounted drill rig. <br />AUTHORIZATION AND SCHEDULE <br />Our work will be performed in accordance with the attached General Terms and Conditions. The <br />attached Proposal Acceptance Agreement should be completed to serve as our written authorization <br />to proceed. We can begin the fieldwork on this project within three to four workweeks following receipt <br />of written authorization. The field work will require one (1) to 2 workdays. Our report can be submitted <br />within two work weeks following the completion of the field work. <br />lm <br />CONSTRUCT IONQUAIITY<\SSURANCE IiNFRA3IPIY,IhRE-f:NE.RGY PROGRANIVIANAGF-MENT CNVIROiNNFNfAL 445 <br />
The URL can be used to link to this page
Your browser does not support the video tag.