Laserfiche WebLink
TRIDENT <br />ENVIRONMENTAL <br />marine design and permitting <br />Miami -Dade County RER Permit Fee <br />$ 5,000.00 Approx <br />DERM Mitigation Bond for Rip -Rap <br />$ 16,200.00 Approx. <br />City of Sunny Isles Beach <br />TBD <br />FDEP <br />$ 100.00 <br />CONSTRUCTION PHASE / INSPECTIONS/ PERMIT CLOSE OUT: <br />a. Engineered inspections for framing, reinforcing steel, pile logs and/or close out letters <br />may be required by your municipality during the construction phase. Inspections will <br />be charged at $450.00 each as they occur. <br />b. We will coordinate with your contractor for all inspections, including inspections noted <br />above. 48 -hours' notice is required to produce inspection logs. <br />c. Engineer letter approving deviations from plans shall be $1,000.00 each. <br />d. We will coordinate with contractor for ail inspection, however it is Owner's and <br />Contractor's responsibility to monitor permit expirations. Building permits expire 180 <br />days from permit issuance unless there is an approved inspection. <br />e. Your municipality may require additional surveys upon project completion in order to <br />close out building permits. This cost is not included in this proposal. <br />PAYMENT TERMS: <br />1. 50 % of Design and Permit Phase Due Upon Signing. <br />2. Balance of Design and Permit Phase and Due Upon Issuance of Permits. <br />Accepted by: <br />TRI <br />Date <br />NMENTAL CONSULTANTS, INC. <br />sident <br />W <br />a) <br />W <br />M <br />a- <br />447 <br />