Laserfiche WebLink
SCHEDULE 12(n) <br />PRINCIPAL PROJECT CONTRACTS <br />A. Existing Principal Project Contracts <br />No. Contract Date Parties Description <br />1 Agreement for NMB May 22, City of North Miami Agreement for CH2M Hill to <br />Water Operations, 2017 Beach, Florida and perform Basic Operation and <br />Maintenance, and CH2M Hill Maintenance Services, Repair <br />Program Management Engineers, Inc. and Replacement Services, and <br />Services Program Management Services. <br />3 <br />B. Additional Principal Project Contracts <br />Contract Expected Effective Parties Description <br />Date (if known) <br />Construction of Phase 2 UnknownCity and to be Norwood Water Treatment <br />Upgrades to Norwood WTP determinedPlant Phase 2 Project <br />construction <br />Construction for Phase II and UnknownCity and to be Eastern Shores Watermain <br />III of Eastern Shores determinedProject installation and <br />Watermain System construction <br />Rehabilitation <br />Construction of Norwood UnknownCity and to be Norwood WTP Electrical <br />WTP Electrical System determinedSystem Improvements <br />Improvements Project Installation and <br />Construction <br />Construction of System-wide UnknownCity and to be System-wide Transmission <br />Transmission Watermains determinedWatermains Replacement <br />Replacement projects construction <br />Construction of System-wide UnknownCity and to be System-wide Distribution <br />Distribution Watermains determinedWatermains Replacement <br />Replacement Programprojects construction <br />Construct SCADA and UnknownCity and to be SCADA and Radio <br />Radio Telemetry System determinedTelemetry System <br />Upgradesinstallation and construction <br />3 <br /> The Additional Principal Project Contracts are proposed and are subject to change, at the Borrower’s sole discretion, <br />including bundling or phasing of projects, services or contracts, in order to (at the Borrower’s opinion) achieve the <br />most effective execution strategy. The Borrower may choose to enter into some of them, all of them or none of them. <br />Any Additional Principal Project Contract will not become final until after approval by the City Commission and <br />execution by the Borrower’s mayor. <br />SCHEDULE 12(n)-1 <br /> <br />