My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RE-BID ITB # 23-10-01 JOINT PROCUREMENT CENTRAL ISLAND
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RE-BID ITB # 23-10-01 JOINT PROCUREMENT CENTRAL ISLAND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 1:29:03 PM
Creation date
10/13/2023 1:26:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INVITATION TO BID NO. 23-10-01 <br />JOINT PROCUREMEMT <br />1.BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br /> <br />LUMP SUM AND/OR UNIT PRICES. <br />2.BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />3.BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br />ITEM NODESCRIPTIONQUANTITYUNITUNIT COSTTOTAL <br />GENERAL ITEMS <br />THE LUMP SUM (LS) PRICES FOR ITEMS SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS. COSTS <br /> <br />FOR PRE-CONSTRUCTION SURVEY ARE TO BE INCORPORATED INTO ITEM 1 AS WELL AS PROJECT SIGN(S). <br />THE LUMP SUM (LS) PRICE FOR (PHASED) CLEARING & STRIPPING SHALL INCLUDE BUT NOT BE LIMITED TO REMOVAL AND PROPER DISPOSAL OF EXISTING GROUND COVERINGS, ASPHALT PAVEMENT <br /> OF <br />VARYING DEPTH, SIDEWALKS, CURB & GUTTER, CONCRETE PAVEMENT, LIMEROCK AND SUBGRADE (WHERE APPLICABLE), TREES AND/OR ALL OTHER ORGANIC MATERIAL FROM RIGHT OF WAY TO RIGHT OF <br /> <br />WAY AS NECESSARY TO PERFORM THE WORK STIPULATED IN THESE CONTRACT DOCUMENTS. THE LUMP SUM PRICE SHALL ALSO INCLUDE BUT NOT BE LIMITED TO REMOVAL, PROTECTION, STORAGE AND <br />REINSTALLATION OF BUS SHELTERS, EXISTING SIGNS, DECORATIVE STONE, LANDSCAPING, AND SPRINKLER SYSTEMS EXISTING WITHIN THE WORK ZONE. ALL ITEMS SHALL BE RESTORED TO AS EXISTING (SUCH <br /> AS <br />EXISTING PAVERS) OR BETTER CONDITION AND AS PER PLANS. <br />Mobilization and Demobilization1LS <br />1 <br />General Conditions1LS <br />2 <br />Bonding1LS <br />3 <br />Overhead and Profit1LS <br />4 <br />5Maintenance of Traffic1LS <br />Survey Stakeout1LS <br />6 <br />As-builts1LS <br />7 <br />Density Testing1LS <br />8 <br />Environmental Compliance (NPDES, SWPPP, Dewatering)1LS <br />9 <br />Desilt completed system pipes - post construction1LS <br />10 <br />Desilt completed system structures - post construction1LS <br />11 <br />GENERAL ITEMS SUB-TOAL (1 - 11) <br />$ <br />ROADWORK ITEMS <br />THE PRICE FOR EACH ROAD WORK ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br /> <br />CONTRACT DOCUMENTS. <br />Removal & Disposal of Existing 24" or Smaller Storm Pipe4,228LF <br />12 <br />Plug Existing 24" or Smaller Storm Pipe14EA <br />13 <br />Removal/Disposal of Existing Drainage Structure40EA <br />14 <br />15No Parking Striping w/two No Parking Signs adjacent to North Pump Station1LS <br />1 inch Milling17,500SY <br />16 <br />171 inch of Asphalt Overlay (SP-9.5)28,000SY <br />ROADWORK ITEMS SUB-TOAL (12 - 17) <br />$ <br />STORMWATER STRUCTURES ITEMS <br />THE PRICE FOR EACH DRAINAGE STRUCTURE CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN <br />ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE APPLICABLE, DE-WATERING & NPDES <br />PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, <br />BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT <br />PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. <br />Type 7 Manhole w/48" Round Bottom & USF 58043EA <br />18 <br />Type 7 Manhole w/48" x 48" Rect Bottom & USF 5807EA <br />19 <br />Type 7 Manhole w/60" Round Bottom & USF 58010EA <br />20 <br />Type 7 Manhole w/60" x 60" Rect Bottom & USF 5802EA <br />21 <br />22Type 7 Manhole w/72" Round Bottom & USF 5801EA <br />Type 7 Manhole w/144' Round Bottom w/48" Riser w/USF 5801EA <br />23 <br />Type 7 Manhole w/72" Round Bottom w/48"Riser w/USF 5801EA <br />24 <br />Type 7 Manhole w/72" x 72" Rect. Bottom & USF 580 w/48" Riser2EA <br />25 <br />9' x 6' Manhole Control Structure W/USF 580 (2) & Concrete Weir (SWBX)1EA <br />26 <br />11' x 11' Manhole Control Structure W/USF 580 (2) & Concrete Weir (NWBX)1EA <br />27 <br />Type 7 Manhole w/72" x 48" Rect. Bottom & USF 5803EA <br />28 <br />P-9 Curb Inlet1EA <br />29 <br />30P-6 Inlet w/48" Round Bottom7EA <br />Replace curb inlet w/New P-5 Inlet Top3EA <br />31 <br />P-4 Inlet w/48" Round Bottom1EA <br />32 <br />8' Diameter Downstream Defender2EA <br />33 <br />60" Conflict Structure w/USF 580 for WM w/SS Split Casing1EA <br />34 <br />60" Conflict Structure w/USF 580 for Sewer w/SS Split Casing1EA <br />35 <br />6'x'4' Conflict Structure w/USF 580 for Sewer w/SS Split Casing1EA <br />36 <br />STORMWATER STRUCTURES ITEMS SUB-TOTAL (18-36) <br />$ <br />STORMWATER PIPES ITEMS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.