Laserfiche WebLink
INVITATION TO BID NO. 23-10-01 <br />JOINT PROCUREMEMT <br />1.BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br /> <br />LUMP SUM AND/OR UNIT PRICES. <br />2.BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />3.BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br />ITEM NODESCRIPTIONQUANTITYUNITUNIT COSTTOTAL <br />THE PRICE FOR EACH DRAINAGE PIPE CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN <br />ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE POSSIBLE, DE-WATERING & NPDES <br /> <br />PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, <br />BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT <br />PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. <br />3718" A2000 PVC69LF <br />24" A2000 PVC6488LF <br />38 <br />30" A2000 PVC1306LF <br />39 <br />36" A2000 PVC1364LF <br />40 <br />48" RCP275LF <br />41 <br />72" RCP6LF <br />42 <br />4396" RCP6LF <br />8' x 6' Concrete Box Culvert8LF <br />44 <br />STORMWATER PIPES ITEMS SUB-TOTAL (37 - 44) <br />$ <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS <br />THE PRICE FOR EACH SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br /> <br />CONTRACT DOCUMENTS TO COVER OVEREXCAVATION WITH DISPOSAL OF UNSUITABLE MATERIAL WITH THE ADDITION OF NEW FILL. <br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 18" Pipe69LF <br />45 <br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 24" Pipe6488LF <br />46 <br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 30" Pipe1306LF <br />47 <br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 36" Pipe1364LF <br />48 <br />49Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 48" Pipe275LF <br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 72" Pipe6LF <br />50 <br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 96" Pipe or 8' x 6' Box Culvert14LF <br />51 <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS SUB-TOAL (45 - 51) <br />$ <br />FORCE MAIN ITEMS <br />WITH THE EXCEPTION OF THE FINAL ASPHALT OVERLAY, THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL <br /> <br />AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE <br />POSSIBLE, DE-WATERING & NPDES PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE <br />DURATION OF THE PROJECT, BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME <br />ELEVATION AS EXISTING ASPHALT PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. <br />5230" DIP FM552LF <br />42" DIP FM80LF <br />53 <br />42" x 30" DIP Reducer2EA <br />54 <br />30" - 45 Deg DIP Bend10EA <br />55 <br />30" x 30" DIP Tee1EA <br />56 <br />30" x 30" DIP "True" Wye1EA <br />57 <br />5830" x 18" Reducer4EA <br />18" DIP56LF <br />59 <br />18" Resilient Wedge Flanged Gate Valve4EA <br />60 <br />18" Swing Type Lever & Weight Flanged Check Valve4EA <br />61 <br />18" - 45 Deg DIP Bend4EA <br />62 <br />FORCE MAIN ITEMS SUB-TOAL (52 - 62) <br />$ <br />PUMP STATION ITEMS <br />THE LUMP SUM PRICE OF THIS ITEM SHALL INCLUDE FULL RESTORATION AS PER PLAN. THE FURNISHING OF ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY TO COMPLETELY INSTALL <br /> TWO (2) <br />STORMWATER PUMPING STATIONS (INCLUDING ALL PIPING, PUMPS, VALVE VAULTS, STRUCTURES, CONTROL PANELS, POWER HOOKUP, INCLUDING ALL NECESSARY INSTALLATION PROCEDURES AS <br />DETERMINED BY THE CONTRACTOR AND FROM THE FOLLOWING ITEMS AND ACTIVITIES: SHEET PILING, COFFER DAMS, DEWATERING AND DEWATERING PERMITS, FORMS, PROTECTION OF EXCAVATION <br /> <br />AT ALL TIMES, SPECIFIC TRAFFIC CONTROL AND SPECIFIC NOTICES TO ADJACENT PROPERTY OWNERS REGARDING CLOSURES (IF APPLICABLE) AND INCONVENIENCES. FURNISH ALL MATERIALS, EQUIPMENT AND <br /> <br />LABOR NECESSARY TO INSTALL ALL STORMWATER PUMP STATION ELECTRICAL, COORDINATION WITH FPL FOR NEW SERVICE DROP, POWER VERIFICATION, AND INSTRUMENTATION WORK. INCLUDING, <br /> <br />BUT NOT LIMITED TO: PUMP CONTROL PANEL, STARTERS, CABINETS, SCADA-PLC, CONDUITS, WIRE CABLES, PULL BOXES, POWER RECEPTACLES, SWITCHES, BREAKERS, REINFORCED CONCRETE <br /> <br />EQUIPMENT PAD, AND ALL NECESSARY ELECTRICAL CIRCUITS. STRUCTURAL ELEMENTS OR ACTIVITIES SHALL BE PERFORMED USING THE SERVICES OF A FLORIDA REGISTERED PROFESSIONAL <br /> <br />ENGINEER TO DEVELOP, CERTIFY, SIGN AND SEAL PLANS FOR THE PUMP STATION STRUCTURES AND SPECIFICALLY FOR ACTIVITIES SUCH AS: FORM PLACEMENT AND REMOVAL OF STEEL <br /> SIZE AND <br />PLACEMENT, POURING METHODS FOR THE SPECIFIC MASS OF CONCRETE, CONCRETE CURING, AND PROTECTION METHODS. INCLUDE ALL COST FOR SURVEYING AND AS-BUILT PREPARATION, <br /> <br />BEDDING MATERIAL, BACKFILL AND TEMPORARY ASPHALT RESTORATION, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, HANDICAP RAMP, BACKFILL LIMEROCK BASE MATERIAL COMPACTION <br />LABORATORY TEST, PERMANENT TRENCH RESTORATION , MATERIAL TO BE RESTORED TO PROPOSED ELEVATIONS (GRADE TO SLOPE), TESTING, INSPECTION AND OTHER MISCELLANEOUS WORK. <br /> <br />