Laserfiche WebLink
ITB 23-03-01 Sunny Isles Beach Central Island Area Drainage Improvement and <br />North Miami Beach Distribution System Watermain Replacements <br />112 of theClean Air Act; and any imminently hazardouschemical substanceor mixture <br />pursuant to Section 7 of the Toxic Substances Control Act. The term does not include <br />petroleum, including crude oil or any fraction thereof, which is not otherwise specifically <br />listed or designated as a hazardous substance in the first sentence of this paragraph, <br />and the term does not include natural gas, natural gas liquids, liquefied natural gas, or <br />synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas). <br /> <br />1.19 Hazardous Waste - Those solid wastes designated by OSHA in accordance with 40 CFR <br />261 due to the properties of ignitability, corrosively, reactivity, or toxicity. Any material <br />that is subject to the Hazardous Waste Manifest requirements of the EPA specified in <br />40 CFR Part 262. <br />1.20 Holidays - Those designated non-workdays as established by the City Commission of the <br />City of Sunny Isles Beach. <br />1.21 Inspection – The term “inspection” and the act of inspecting as used in this Agreement is <br />defined to mean the examination of construction to ensure that it conforms to the design <br />concept expressed in the plans and specifications. This term shall not be construed to <br />mean supervision, superintending and/or overseeing. <br />1.22 Notice of Award - The written notice by CITY to the CONTRACTOR stating that upon <br />compliance by the CONTRACTOR with the conditions precedent enumerated therein, within <br />the time specified that the CITY will sign and deliver this Agreement. <br />1.23 Notice to Proceed – A written notice given by the CITY to the CONTRACTOR fixing the date <br />on which the Contract Time will commence to run and on which the Contract Time will end. <br />1.24 Plans - The drawings which show the character and scope of the work to be performed and <br />which have been prepared or approved by the CITY and are referred to in the Contract <br />Documents. <br />1.25 Premises (otherwise known as Site or Work Site) – means the land, buildings, facilities, etc. <br />upon which the Work is to be performed. <br />1.26 Project – The total construction of the Work to be provided as defined in the Contract <br />Documents. <br />1.27 Project Manager - The employee of the CITY, or other designated individual who is <br />herein referred to as the Project Manager, will assume all duties and responsibilities and <br />will have the rights and authorities assigned to the Project Manager in the contract <br />Documents in connection with completion of the Work in accordance with this Agreement. <br />1.28 Punch List - The CITY's list of Work yet to be done or be corrected by the CONTRACTOR, <br />before the Final Completion date can be determined by the CITY. <br />1.29 Record Documents - A complete set of all specifications, drawings, addenda, <br />modifications, shop drawings, submittals and samples annotated to show all changes <br />made during the construction process. <br />1.30 Record Drawings or "As-Built" - A set of drawings which show significant changes in the <br />work made during construction and which are usually based on drawings marked up in <br />PAGE 4 OF 38 <br /> <br />