My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.6. The Contractor shall obtain and pay for all permits, fees and licenses <br />necessary and ordinary for the Work save and except as set forth herein. <br />The Contractor shall comply with all lawful requirements applicable to the Work and shall <br />give and maintain any and all notices required by applicable law pertaining to the Work. <br />7.7 Supervision <br />7.7.1. The Contractor shall employ and maintain at the Project site only competent <br />supervisory personnel. Absent written instruction from the Contractor to the contrary, the <br />superintendent shall be deemed the Contractor's authorized representative at the site and <br />shall be authorized to receive and accept any and all communications from the City or the <br />Engineer / Architect. <br />7.7.2. Key administrative, managerial and supervisory personnel assigned by the <br />Contractor to this Project are as follows: <br />Name Fu nction <br />/ nn49 <br />oA+�lq�tc� �G ��t c�k12r��4 <br />The Contractor shall furnish to the City complete resumes of each of the individuals named <br />above. So long as the individuals named above remain actively employed or retained by the <br />Contractor, they shall perform the functions indicated next to their names unless the City <br />agrees to the contrary in writing or unless the City requests the removal of any such <br />individual from the Project. In the event the City requests the removal of any of the <br />individuals named above, the Contractor shall immediately comply and shall immediately <br />replace such individual with a qualified substitute to whom the City makes no objection. In <br />the event one or more individuals not listed above subsequently assumes one or more of <br />those functions listed above, the Contractor shall be bound by the provisions of this <br />Subparagraph 7.7.2 as though such individuals had been listed above. <br />7.8. The Contractor, within fifteen (15) days of commencing the Work, shall submit <br />to the City and the Engineer / Architect for their information, the Contractor's schedule for <br />completing the Work. The Contractor's schedule shall be presented in the critical path <br />(CPM) format. The Contractor's schedule shall be revised no less frequently than monthly <br />(unless the parties otherwise agree in writing) and shall be revised to reflect conditions <br />encountered from time to time and shall be related to the entire Project. Each such revision <br />Page 17 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.