My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or their protection from damage, injury or loss, and shall give all notices required by same; <br />this requirement includes, but is not limited to, the United States Occupational Safety and <br />Health Act and the Florida Trench Safety Act, Florida Statute S 553.60. <br />7.14 Indemnity <br />7.14.1. To the fullest extent permitted by law, CONTRACTOR shall indemnify and hold <br />harmless CITY, its officers and employees, from liabilities, damages, losses and costs, <br />including, but not limited to, reasonable. attorneys' fees, to the extent caused by the <br />negligence, recklessness or intentional wrongful misconduct of CONTRACTOR and persons <br />employed or utilized by CONTRACTOR in the performance of this Contract. This <br />indemnification shall survive the term of this Contract. <br />7.15 Value Engineering Incentive <br />7.15.1. The City encourages the Contractor to make timely value engineering and cost <br />savings recommendations. In the event the City approves by duly executed change order <br />any value engineering or cost savings recommendation of the Contractor, and in the further <br />event the Contract Sum is reduced thereby, any savings shall be shared with Seventy -Five <br />Percent (75%) being allocated City and Twenty -Five Percent (25%) being allocated to the <br />Contractor. It is agreed, however, that the Contractor shall procure and obtain at its sole <br />cost and expense all change orders, drawings, specifications, permits, approvals, or other <br />documents required in order to implement the value engineering or cost savings <br />recommdation. ANY CLAIM UNDER THIS PARAGRAPH MUST BE SUBMITTED IN <br />WRITING TO THE CITY AND THE ENGINEER / ARCHITECT PRIOR TO THE <br />EXECUTION OF THE CHANGE ORDER INCORPORATING THE CONTRACTOR'S <br />RECOMMENDATION OTHERWISE SAID CLAIM IS EXPRESSLY WAIVED. Any <br />savings allocated to the Contractor under this Paragraph shall be paid at the <br />time of Final Payment to the Contractor. <br />7.16 Miscellaneous <br />7.16.1. Prior to commencement of the Work, the Contractor shall submit to the City <br />a plan for site access and control of construction traffic. Said plan shall include, but not be <br />limited to, an enumeration of each construction access point to the site and a description <br />of how access will be controlled and regulated; a description of any impact that <br />construction traffic may have on the public streets and highways, and the Contractor's plan <br />for minimizing and reducing such impact; and, the name and address of the individual <br />employed by the Contractor who shall have responsibility for control and management of <br />construction traffic. Approval by the City of this plan is a condition precedent to payment <br />of any sums to the Contractor. The Contractor furthermore agrees to cooperate with the <br />City and all other appropriate governmental entities with respect to the control, regulation, <br />scheduling and management of construction traffic. <br />Page 20 of 43 <br />288 <br />
The URL can be used to link to this page
Your browser does not support the video tag.