My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the manner in which the Contractor intends to implement the Work in conformance with <br />information received from the Contract Documents. <br />7.10.2. The Contractor shall not perform any portion of the Work requiring submittal <br />and review of Shop Drawings, Product Data or Samples unless and until such submittals <br />shall have been approved by the Engineer / Architect. Approval by the Engineer / Architect, <br />however, shall not be evidence that Work installed pursuant thereto conforms with the <br />requirements of this Contract. <br />7.10.3. The Contractor shall maintain a log of all Shop Drawings, Product Data and <br />Samples submitted to the Engineer / Architect and the City including, but not limited <br />to, identification of the item of work according to appropriate specification section; date of <br />receipt from appropriate subcontractor or supplier; date of review by the Contractor; date <br />of submission to the Engineer / Architect date of return from the Engineer / Architect date <br />of return to the subcontractor or supplier status of review by the Engineer / Architect and <br />any required re -submittal information. A true and correct copy of this log shall be submitted <br />with each Application for Payment and receipt of same by the Engineer / Architect shall be <br />a condition precedent for approval of the Application for Payment. <br />7.11 Cleaning the Site and the Proiect <br />7.11.1. The Contractor shall keep the site reasonably clean during performance of the <br />Work, shall remove debris, trash and garbage from the Site daily and allow no accumulation <br />of debris, garbage or trash on the Site. Upon Final Completion of the Work, the Contractor <br />shall clean the site and the Project and remove all waste, together with all of the <br />Contractor's property therefrom. <br />7.12 Access to Work <br />7.12.1. The City, the Engineer / Architect and the Building Department shall have <br />access to the Work at all times from commencement of the Work through Final Completion. <br />The Contractor shall take whatever steps necessary to provide access when requested. <br />7.13 Safety <br />7.13.1. The Contractor shall take all reasonable precautions for safety of, and shall <br />provide reasonable protection to prevent damage, injury or loss to, its employees on the <br />Work and all other persons who may be affected thereby; the Work and materials and <br />equipment to be incorporated therein; and all other property at the site or adjacent thereto <br />including, but not limited to, trees, shrubs, lawns, walks, pavements, roadways, structures <br />and utilities not designated for removal, relocation or replacement in the course of <br />construction. The Contractor shall comply with all applicable laws, ordinances, rules, <br />regulations and lawful orders of public authorities bearing on safety of persons or property <br />Page 19 of 43 <br />287 <br />
The URL can be used to link to this page
Your browser does not support the video tag.