74 Olexandr <br />Kaltsev P100 CITY OF SUNNY <br />ISLES BEACH <br />The new grease interceptors will be connected to grease waste piping serving an <br />area that is not in the contract work. Our warranty will only cover the <br />interceptors only. Proper functionality of the grease waste system can not be <br />confirmed. There are not any notes referencing videoing or jetting of the existing <br />grease waste piping to confirm functionality, please advise. <br />SHOULD JET BUILDING SYSTEM <br />75 Olexandr <br />Kaltsev <br />PD101, AD-101 & <br />AD102 PLUMBING <br />There is a significant concrete slab footprint of demolished piping below grade <br />noted on PD101, and new below sanitary piping on P101. There are not any notes <br />for demolition and concrete patch on AD-101 & AD-102, or the structural <br />drawings. The large amount of removed slab would require a concrete patch that <br />is not illustrated on the architectural or structural drawings. Please advise which <br />trade will be responsible for the slab demolition and patch. <br />THE PLUMBING CONTRACTOR SHALL DEMOLISH THE CONCRETE AND THE <br />STRUCTURAL CONTRACTOR SHALL PATCH THE CONCRETE <br />76 Olexandr <br />Kaltsev <br />Specification <br />Section 154050 - <br />3.1 <br />PLUMBING <br />Regarding the piping applications for plumbing piping, although copper is <br />included in Part 2 - Products, there is not a piping system specified in Part 3 - <br />Execution for domestic water. Will CPVC be acceptable for the domestic water <br />distribution system? <br />CPVC IS AN ACCEPTABLE PRODUCT FOR THE DOMESTIC WATER DISTRIBUTION <br />SYSTEM <br />77 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Will any portions of the building require domestic water and sanitary services <br />during the construction period?NO <br />78 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Will VE options for long lead time mechanical items be accepted if they have <br />shorter lead times and are equivalent (RTUs)YES <br />79 Olexandr <br />Kaltsev MECHANICAL <br />Is there any demo work needed by the mechanical contractor for the HVAC <br />scope. Is the mechanical contractor responsible for the demo of existing <br />ductwork and RTUs? <br />Contractor shall modify the existing HVAC duct work to match final plans. <br />80 Olexandr <br />Kaltsev MECHANICAL Are there existing DDC or BMS controls that the new equipment will have to tie <br />into?There will be a new BMS system installed that the new equipment can tie into. <br />81 Olexandr <br />Kaltsev <br />M402 & Section 23 <br />09 23 - 1.1 MECHANICAL Is the CASLink BMS and DDC controls provided and installed by a separate <br />controls contractor or the responsibility of the mechanical contractor?The CASLink BMS is the responsibility of the mechanical contractor. <br />82 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH Are the RTUs owner provided or provided by the mechanical contractor?BY CONTRACTOR <br />83 Olexandr <br />Kaltsev <br />Division 15 - 15 37 <br />10 <br />CITY OF SUNNY <br />ISLES BEACH <br />I do not see a kitchen or hoods on the plans but the specifications have <br />Commercial Kitchen Hoods. Are there kitchen hoods for this project?NO <br />84 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Will VE options for long lead time electrical items be accepted if they have <br />shorter lead times and are equivalent (Generator)YES <br />85 Olexandr <br />Kaltsev E602 ELECTRICAL <br />Please confirm quantity and size of existing telecom service raceways which need <br />to be rerouted to adjacent IDF Closet. Drawing E602 shows (2) 3" Raceways <br />coming from Concrete handhole. Are these raceways the ones that currently <br />exist in the electrical closet? <br />Existing telecom service raceways are to be demolished. Raceways shown on <br />E602 are new. <br />86 Olexandr <br />Kaltsev C100 CIVIL <br />Drawing C-100 mentions the light pole to be relocated. Drawing C-101 indicated <br />the new location for the existing light pole. ES100 calls for a new site light. Please <br />clarify the scope associated with Site Lighting Poles. Additionally, the weather <br />site light pole is expected to be powered from a new panelboard inside the <br />building. <br />Light pole has been coordinated between drawings.