Laserfiche WebLink
58 <br />CITY OF SUNNY <br />ISLES BEACH/ <br />ARCHITECTURE <br />As per the invitation, GC should pay and pull for the permit. So please provide a <br />permit number or an allowance to include in the proposal. Add $10,000 for permit fees. City will pay most fees. <br />59 STRUCTURAL As per structural notes, Helical piles to be a minimum of 243’ deep but as per <br />geotechnical report it should de 24’. Please advise. The correct length of pile shall be 24', per the geotechnical report. <br />60 <br />CITY OF SUNNY <br />ISLE BEACH/ <br />ARCHITECTURE <br />Please confirm there is no scope to be performed in future leasing space.Correct, only stubbing for water, gas, sewer and grease trap, electric <br />61 CIVIL/ <br />ARCHITECTURE Please provide the manufacturer and model of pavers.Refer to response RFI #28 <br />62 ARCHITECTURE Is the general contractor responsible for furnishing and installing furniture? If so, <br />do city have any preferred vendors to work with? <br />Yes, GC is responsible for furnishing and installing furniture. Refer to furniture <br />package attached. <br />63 FP/ <br />ARCHITECTURE Provide the information of existing fire alarm system. <br />Existing Fire Alarm System is Fire-lite MS-10UD - Existing Fire Alarm System is <br />being completely demolished. A completely new fire alarm system will be <br />installed for the building as shown on the drawings. <br />64 CITY OF SUNNY <br />ISLES BEACH Can the City provide the asbestos report? YES <br />65 ES100 ELECTRICAL <br />200KW Generator – ES100 calls for Natural Gas; Tech Spec 162310 1.1 A 1 calls <br />for Propane Gas; Tech Spec 162310 2.8 B references a “diesel engine” … Please <br />confirm the fuel type for the generator. <br />Natural Gas. Diesel fuel tank requirements removed from spec. <br />66 Tech Spec 162310 ELECTRICAL <br />200KW Generator – Tech Spec 162310 2.1 C shows “enerac” as an approved <br />manufacturer. Should this be “Generac”? If no, please confirm correct approved <br />manufacturer. <br />MTU is the basis of design along with Kohler and Caterpillar as approved equals. <br />Generac has been removed. <br />67 A-101.2 & A-601 ARCHITECTURE <br />Furniture – Note 1 on A101.2 & A-601 states “REFER TO FURNITURE VENDOR'S <br />PLANS AND PRELIMINARY BUDGET LIST FOR ALL OF FURNITURE EQUIPMENT <br />QUOTED FOR THIS PROJECT”. Please supply this documentation. <br />Refer to furniture package attached. <br />68 A-601 ARCHITECTURE Furniture – A-601 -While Product numbers are supplied, manufacturers are not <br />specified for all products. Please provide manufacturers for all products.Refer to furniture package attached. <br />69 A-505 ARCHITECTURE <br />A-505 shows wood fence anchored to concrete curb on existing wall. Please <br />provide height, attachment detail, post detail, and required wood type (species, <br />PT, etc). <br />Refer to revised sheet A-505 <br />70 STRUCTURAL <br />Takeoff measurements of the structural plans are not returning the same <br />measurements as shown on the drawings. Please confirm that the drawings <br />conform to the notated scale. <br />As per the Coordination note on Sheet S-1.0, no dimensions shall be scaled <br />from drawings; written dimensions take precedence. <br />71 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Will VE options for long lead time plumbing items be accepted if they have <br />shorter lead times and are equivalent (Grease trap)YES <br />72 Olexandr <br />Kaltsev PD100 & P101 CITY OF SUNNY <br />ISLES BEACH <br />The grease waste line serving the cafe will be off line for a period of time to <br />accomplish the demolition of the existing grease interceptors (PD100) and <br />installation of new interceptors (P100). Are temporary grease waste services <br />required? <br />NO <br />73 Olexandr <br />Kaltsev PD100 & P101 CITY OF SUNNY <br />ISLES BEACH <br />The demolition of the existing grease interceptors and the installation of the new <br />grease interceptors will require a road closure that will block the two <br />handicapped parking spaces. Is there a minimum timeframe that those spaces <br />can remain inaccessible? <br />NO