My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 010110-4 <br />approval of the water utility, cut the service, dig through, and restore the service with <br />similar and equal materials at the Contractor's expense and as approved by the Engineer. <br />F. Replace, with material approved by the Engineer, at Contractor's expense, any and all <br />other laterals, existing utilities or structures removed or damaged during construction, <br />unless otherwise provided for in these Contract Documents and as approved by the <br />Engineer. <br /> <br />1.6 INTERFERING STRUCTURES <br /> <br />A. Take necessary precautions to prevent damage to existing structures whether on the <br />surface, above ground, or underground. An attempt has been made to show major <br />structures on the Plans. While the information has been compiled from the best available <br />sources, its completeness and accuracy cannot be guaranteed, and is presented as a <br />guide. The Contractor is solely responsible for field verification of all locations. <br /> <br />1.7 FIELD RELOCATION <br /> <br />A. During the process of construction, it is expected that minor relocations of the work may <br />be necessary. Such relocations shall be made only by the direction of the Engineer <br />at the Contractor’s expense. If existing structures are encountered that will prevent <br />construction as shown, notify the Engineer before continuing with the work in order that <br />the Engineer may make such field revisions as necessary to avoid conflict with the <br />existing structures. If the Contractor fails to notify the Engineer when an existing <br />structure is encountered, and shall proceed with the work despite this interference, <br />the Contractor does so at his own risk. <br /> <br />B. Representatives of utility companies, the railroad companies, the traffic and <br />transportation authorities, etc., shall be notified in accordance with the provisions set <br />forth in the relevant sections of the Specifications and the permitting documents. <br /> <br /> <br />PART 2 – PRODUCTS NOT USED <br /> <br />PART 3 – EXECUTION NOT USED <br /> <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.