My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3795
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 4:04:06 PM
Creation date
2/26/2025 3:58:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Number
2024-3795
Date (mm/dd/yyyy)
02/20/2025
Supplemental fields
Comment
Sent to Rick Labinsky to get DOT to execute Agreement. 2/26/25.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FM# 451053-1 <br />Page 2 of 13 <br />TERMS <br />NOW THEREFORE, in consideration of the premises, the mutual covenants and other valuable <br />considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the <br />Parties agree as follows: <br />1. The recitals in this Agreement are true and correct, and incorporated into and made a part hereof. <br />2. The Parties agree that the Department intends to undertake and complete Project Number FM# <br />451053-1-52-01, which Project generally includes the following: <br />Roadway; <br />Signing and Pavement Markings; and <br />Signalization. <br />The Project shall include improvements on 170th St., 172nd St., 174" St., and 178th St. as shown <br />in Exhibit "B" attached hereto and made a part hereof (for purposes of this agreement, the "Off - <br />System Project Limits"). The work within the Off -System Project Limits shall include, but may <br />not be limited to the following (hereinafter referred to as the "Local Roadway Improvements"): <br />a) 170th St. (Sign Removal and sidewalk replacement); <br />b) 172nd St. (Sign Removal and sidewalk replacement); <br />c) 178th St. (Sign Removal and sidewalk replacement); and <br />d) 174th St. (Signalization conduits, installation of signal pull boxes and sidewalk <br />replacement). <br />The Project shall further include all activities associated with or arising out of the construction <br />of the Local Roadway Improvements. In the event that the Project requires the acquisition of <br />additional right-of-way within the Off -System Project Limits, the Department shall acquire such <br />right-of-way in order to complete the Project. The City shall cooperate with and shall support the <br />Department's work efforts in these regards. <br />The Department will design and construct the Project in accordance with all applicable federal <br />and state laws and regulations and in accordance with Department design and construction <br />standards as set forth in the Department's guidelines, standards, and procedures. The Department <br />shall have final decision authority with respect to the design, the design review process, and <br />Rev. 10/24 2 <br />96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.