My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERNEST
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
ERNEST CONSTRUCTION FL INC
>
ERNEST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:01:39 PM
Creation date
3/10/2025 12:59:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Pedestrian Safety Measures <br /> ● Temporary Walkways: Designated pedestrian pathways with protective barriers will be <br /> installed to maintain safe foot traffic. <br /> ● Crosswalk Detours: Clearly marked detour signs will direct pedestrians to safe <br /> crossings. <br /> ● ADA Compliance: Temporary access ramps will be provided to accommodate individuals <br /> with disabilities. <br /> ● Nighttime Visibility: Adequate lighting will be installed in affected areas to ensure <br /> pedestrian safety after dark. <br /> 4. Work Zone Protection <br /> ● Barrier Placement: Water-filled barriers will be strategically placed to define and protect <br /> work zone perimeters. <br /> ● Speed Reduction Measures: Traffic speed will be reduced near work zones through <br /> signage and law enforcement monitoring. <br /> ● Construction Vehicle Access: Designated entry and exit points for construction vehicles <br /> will be established to prevent interference with public traffic. <br /> 5. Emergency Access Considerations <br /> ● Uninterrupted Access: Coordination with local fire, police, and EMS will ensure <br /> emergency response teams have continuous access to the site. <br /> ● Dedicated Emergency Lane: A designated emergency access route will be maintained at <br /> all times. <br /> ● 24/7 Emergency Contact: A designated contact will be available around the clock for <br /> emergency coordination. <br /> 6. Phasing & Coordination <br /> Phase 1 - Pre-Construction <br /> ● Installation of advance warning signs and detour signage. <br /> ● Establishment of pedestrian walkways and safety barriers. <br /> Phase 2 - Active Construction <br /> ● Implementation of lane closures and detours as necessary. <br /> ● Continuous monitoring by traffic control personnel to ensure compliance and adjust <br /> measures if required. <br /> Ernest Energy Inc. ITB 250101
The URL can be used to link to this page
Your browser does not support the video tag.