Laserfiche WebLink
3. Quality Control Procedures <br /> 3.1 Pre-Construction <br /> ● Review all construction plans, specifications, and contractual requirements. <br /> ● Approve materials, suppliers, and subcontractors based on quality standards. <br /> ● Conduct pre-installation meetings and training to align teams on QA/QC expectations. <br /> 3.2 During Construction <br /> ● Perform daily inspections to ensure quality workmanship and material compliance. <br /> ● Monitor environmental and safety compliance in accordance with regulatory standards. <br /> ● Conduct field testing, including concrete strength tests, soil compaction analysis, and <br /> structural integrity assessments. <br /> 3.3 Post-Construction <br /> ● Conduct final inspections and develop a punch list for corrective actions. <br /> ● Obtain necessary certifications and approvals from relevant authorities. <br /> ● Ensure all as-built documentation is complete and archived for future reference. <br /> 4. Testing & Inspection Requirements <br /> 4.1 Structural & Material Testing <br /> ● Concrete Strength Testing: Conducted per ASTM standards to verify mix consistency <br /> and load-bearing capacity. <br /> ● Soil Compaction Testing: Ensures proper foundation support in compliance with project <br /> specifications. <br /> ● Structural Steel Inspections: Includes welding, bolting, and coatings verification. <br /> 4.2 Mechanical, Electrical, & Plumbing (MEP) Inspections <br /> ● Electrical System Compliance: Verification of wiring, grounding, and load capacities. <br /> ● Plumbing System Testing: Pressure tests, leak detection, and pipe alignment <br /> inspections. <br /> ● HVAC System Performance: Airflow, insulation, and energy efficiency evaluations. <br /> 5. Non-Conformance & Corrective Actions <br /> ● Identification & Documentation: All quality deviations will be recorded in <br /> non-conformance reports (NCRs). <br /> Ernest Energy Inc. ITB 250101