My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3942
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2026 10:23:52 AM
Creation date
1/28/2026 4:44:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3942
Date (mm/dd/yyyy)
01/15/2026
Description
Approving a Community Aesthetic Feature Agreement w/ FDOT for design, installation, & maintenance of (3) local identification markers known as signage
Supplemental fields
Comment
Sent to Amy for remainder of signatures from FDOT.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
625-010-10 <br />ROADWAY DESIGN <br />OGC - 08/17 <br />Page 3of12 <br />Agreement as Exhibit "E". The certification shall state that work has been completed in compliance <br />with the Project construction plans and specifications. If any deviations are found from the approved <br />plans, the certification shall include a list of all deviations along with an explanation that justifies the <br />reason to accept each deviation. The Agency and its contractors shall remove their presence, <br />including, but not limited to, all of the Agency or its contractor's/ subcontractor's/ consultant's/ <br />subconsultant's property, machinery, and equipment from the Department's right-of-way and shall <br />restore those portions of the Department's right-of-way disturbed or otherwise altered by the Project to <br />substantially the same condition that existed immediately prior to the commencement of the Project, at <br />Agency's sole cost and expense. <br />k. If the Department determines that the Project is not completed in accordance with the provisions of this <br />Agreement, the Department shall deliver written notification to the Agency. The Agency shall have thirty <br />(30) days from the date of receipt of the Department's written notice to complete the Project and provide <br />the Department with written notice of the same ("Notice of Completion"). If the Agency fails to timely <br />deliver the Notice of Completion, or if it is determined that the Project is not properly completed after <br />receipt of the Notice of Completion, the Department may: 1) provide the Agency with written <br />authorization granting additional time as the Department deems appropriate to correct the <br />deficiency(ies); or 2) correct the deficiency(ies) at the Agency's sole cost and expense, without <br />Department liability to the Agency for any resulting loss or damage to property, including but not limited <br />to machinery and equipment. If the Department elects to correct the deficiency(ies), the Department shall <br />provide the Agency with an invoice for the costs incurred by the Department and the Agency shall pay <br />the invoice within thirty (30) days of the date of the invoice. <br />Upon completion of the Project, the Agency shall be responsible for the perpetual maintenance of the <br />Project, including all costs. The maintenance schedule shall include initial defect, instantaneous damage <br />and deterioration components. The initial defect maintenance inspection should be conducted, and any <br />required repairs performed during the construction phase. The instantaneous damage maintenance <br />inspection should be conducted sixty (60) to ninety (90) days after placement and is intended to identity <br />short term damage that does not develop over longer time periods. The deterioration maintenance <br />inspection shall be conducted on regular, longer term intervals and is intended to identify defects and <br />damages that occur by naturally occurring chemical, physical or biological actions, repeated actions such <br />as those causing fatigues, normal or severe environmental influences, abuse or damage due to other <br />causes. Deterioration maintenance shall include, but is not limited to, the following services: <br />If the structures are damaged the Agency has 48 hours to implement any necessary safety measures including but not limited to <br />Ensuring parts of the structure are moved outside the clear zone (as defined in the latest versions of FOOT Standard Plans for <br />Road and Bridge Construction Index 102-600) Permanent repairs should be completed within 90 days of commencing the repair <br />work If the department elects to complete a repair, the Department shall provide the agency with an invoice for the costs incurred <br />by the Department and the Agency shall pay the invoice within thirty (30) days of the date of the invoice. The Agency will be <br />responsible to repair damage to the Department's assets caused by the structure regardless of whether the damage is caused by <br />the Agencyand including but not limited to damage caused by crashes accidents thefts acts of God etc. <br />m. The Agency shall, within thirty (30) days after expiration or termination of this Agreement, remove the <br />Project and restore the right-of-way to its original condition prior to the Project. The Agency shall secure <br />its obligation to remove the Project and restore the right-of-way by providing a removal and restoration <br />deposit, letter of credit, or performance bond in the amount of $35,000. The removal and restoration <br />deposit, letter of credit, or bond shall be maintained by the Agency at all times during the term of this <br />Agreement and evidence of the deposit, letter of credit, or bond shall be submitted to the <br />625 <br />
The URL can be used to link to this page
Your browser does not support the video tag.