Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />at the discretion of the City and must be authorized by the City's Representative and <br />approved by the City. <br />ARTICLE V <br />PAYMENT OF THE CONTRACT PRICE <br />5.1 Schedule of Values <br />5.1.1 At least seven (7) days before the first Pre -Construction Meeting, the <br />Contractor shall submit to the City and to the City's Representative a Schedule of Values <br />allocating the Contract Price to the various portions of the Work in conformance to the <br />revised bid form submitted by Contractor in response to the ITB. The Schedule of Values <br />shall be used only as a basis for the Contractor's Applications for Payment and shall only <br />constitute such basis after it has been acknowledged in writing by the City's Representative <br />and the City. <br />5.2 Payment Procedure <br />5.2.1 The City shall pay the Contract Price to the Contractor as provided below. <br />5.2.2 Progress Payments. Based upon the Contractor's Payment Requests to the <br />City's Representative and upon Certificates for Payment subsequently issued to the City <br />by the City's Representative, the City shall make progress payments to the Contractor on <br />account of the Contract Price. Contractor shall use the AlA G-702 / 703 payment submittal <br />method. <br />5.2.3 On or before the 25th day of each month after commencement of the Work, <br />the Contractor shall submit a Payment Request for the period ending the last day of the <br />previous month to the City Representative in such form and manner, and with such <br />supporting data and content, as the City or the City Representative may require. <br />Contemporaneously with the submission of each Application for Payment, the Contractor <br />shall submit a current shop drawing log reflecting the status of all shop drawings and <br />submittals; a current CPM schedule as required by Paragraph 7.9 herein below; lien <br />copies of releases from Contractor and releases from subcontractors in favor of <br />Contractor's Surety confirming receipt of funds received from the City for the previous <br />payment period; and the Contractor shall have a current set of As -Built drawings <br />maintained on site including bore logs as may be applicable and available for inspection. <br />Submission of the shop -drawing log, CPM schedule, and photographs as required herein <br />shall be a condition precedent for payment to the Contractor. With regard to any <br />Contract for construction services, a public entity may withhold from each progress <br />payment made to the Contractor an amount not exceeding 5 percent of the payment as <br />retainage. Payment for stored materials and equipment shall be contingent upon the <br />Contractor's proof satisfactory to the City, that the City has title to such materials and <br />equipment and shall include proof of required insurance sufficient to protect the City from <br />any loss should the materials and equipment be lost, stolen or otherwise destroyed or <br />damaged. <br />COMTECH ENGINEERING, INC. <br />