My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />documentation in the forms required or requested by the City, the City's Representative, <br />or the City's Consultant Engineer. <br />3.3 Time is of the Essence <br />3.3.1 All limitations of time set forth in the Contract Documents are of the essence of <br />this Contract. <br />3.4 The Terms of Sections 1.8, 7.15, and 7.5 entitled "Compliance with Laws", <br />"Indemnity" and "Warranty", respectively, shall survive the expiration or termination of this <br />Agreement. <br />3.5 Liquidated Damages. Failure to complete all the work within the time specified above, <br />including any extension granted in writing by the City, shall obligate the Contractor to pay the <br />City, as liquidated damages and not as a penalty, an amount equal to One Thousand Dollars <br />and No Cents ($1,000.00) for each calendar day of delay in the completion of all the work. If <br />any liquidated damages are unpaid by the Contractor, the City shall be entitled to deduct these <br />unpaid liquidated damages from the monies due the Contractor. <br />ARTICLE IV <br />CONTRACT PRICE <br />4.1 The Contract Price <br />4.1.1 The City shall pay, and the Contractor shall accept, as full and complete <br />payment for all of the Work required herein, Two Million Nine Hundred Sixty -Three <br />Thousand Two Hundred Thirteen Dollars and Twenty -Two Cents ($2,963,213.22), <br />which amount was previously approved by the City Commission via Resolution No. 2023- <br />3557. The total fixed sum set forth in this Paragraph 4.1.1 shall constitute the Contract <br />Price which shall not be modified except by Change Order as provided in this Contract. <br />4.2. Contingency <br />4.2.1 In addition to the Contract Price set forth in Paragraph 4.1.1, there shall be a <br />contingency in the amount of Four Hundred Sixteen Thousand Three Hundred Seventy - <br />Six Dollars and Sixty Cents ($416,376.60), which amount was previously approved by <br />the City Commission via Resolution No. 2023-3557. The contingency accounts for all <br />labor, materials, equipment, overhead, and services necessary for modification or extra <br />work required to complete the Work because of unforeseen conditions, unforeseen <br />conflicts between existing elements of work and the proposed work; for minor changes <br />required to resolve any unforeseen conditions, Revised Regulations, Technological and <br />Products Development, Operational Changes, Schedule Requirements, Program Interface, <br />Emergencies, and Other Miscellaneous Costs, and for adjustments to estimated quantities <br />installed, and associated time related to the Work. Unforeseen conditions or conflicts as <br />used in this Paragraph 4.2.1, are those conditions which could not have been determined <br />or ascertained from a thorough and careful examination and inspection of the site as <br />provided by Paragraph 1.5.8. The disbursement of all or part of the contingency is entirely <br />COMTECH ENGINEERING, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.