Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />7.11 Shop Drawings, Product Data and Samples <br />7.11.1 Shop Drawings, Product Data, Samples, and other submittals from the <br />Contractor do not constitute Contract Documents. Their purpose is merely to demonstrate <br />the manner in which the Contractor intends to implement the Work in conformance with <br />information received from the Contract Documents. <br />7.11.2 The Contractor shall not perform any portion of the Work requiring submittal <br />and review of Shop Drawings, Product Data, or Samples unless and until such submittals <br />have been approved by the City's Representative. Approval by the City's Representative, <br />however, shall not be evidence that Work installed pursuant thereto conforms with the <br />requirements of this Contract. <br />7.11.3 The Contractor shall maintain a log of all Shop Drawings, Product Data, and <br />Samples submitted to the City's Representative and the City including, but not limited <br />to, identification of the item of work according to appropriate specification section; date of <br />receipt from appropriate subcontractor or supplier; date of review by the <br />Contractor; date of submission to the City's Representative; date of return from the <br />City's Representative; date of return to the subcontractor or supplier; status of review <br />by the City's Representative and any required re -submittal information. A true and <br />correct copy of this log shall be submitted with each Payment Request and receipt of <br />same by the City's Representative shall be a condition precedent for approval of the <br />Payment Request. <br />7.12 Cleaning the Site and the Project <br />7.12.1 The Contractor shall keep the site clean during performance of the <br />Work, shall remove debris, trash, and garbage from the Site daily and allow no <br />accumulation of debris, garbage, or trash on the Site. Upon Final Completion of the <br />Work, the Contractor shall clean the site and the Project and remove all waste, together <br />with all the Contractor's property therefrom. <br />7.13 Access to Work <br />7.13.1 The City, the City's Representative, and the Public Work's Department <br />shall have access to the Work at all times from commencement of the Work through <br />Final Completion. The Contractor shall take whatever steps necessary to provide access <br />when requested. <br />7.14 Safety <br />7.14.1 The Contractor shall take all reasonable precautions for safety of, and <br />shall provide reasonable protection to prevent damage, injury or loss to, its employees <br />on the Work and all other persons who may be affected thereby; the Work and materials <br />and equipment to be incorporated therein; and all other property at the site or adjacent <br />thereto including, but not limited to, trees, shrubs, lawns, walks, pavements, roadways, <br />structures, and utilities not designated for removal, relocation, or replacement in <br />the course of construction. The Contractor shall comply with all applicable laws, <br />COMTECH ENGINEERING, INC. 18 <br />