My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />ordinances, rules, regulations and lawful orders of public authorities bearing on safety <br />of persons or property or their protection from damage, injury or loss, and shall give <br />all notices required by same; this requirement includes, but is not limited to, the <br />United States Occupational Safety and Health Act and the Florida Trench Safety Act, <br />Florida Statute § 553.60. <br />7.15 Indemnity <br />7.15.1 To the fullest extent permitted by law, Contractor shall indemnify and <br />hold harmless City, its officers, officials, and employees, from liabilities, damages, losses, <br />and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused <br />by the negligence, omissions, recklessness, or intentional wrongful misconduct of <br />Contractor and persons employed or utilized by Contractor in the performance of this <br />Contract. This indemnification shall survive the term of this Contract. <br />7.16 Miscellaneous <br />7.16.1 Two (2) weeks prior to the Pre -Construction Meeting the Contractor shall <br />submit to the City Maintenance of Traffic Plans. Approval by the City of this plan is a <br />condition precedent to payment of any sums to the Contractor. The Contractor furthermore <br />agrees to cooperate with the City and all other appropriate governmental entities with <br />respect to the control, regulation, scheduling, and management of construction traffic. <br />Contractor shall be solely responsible for furnishing all labor, material, and equipment, <br />and performing all operations in connection with traffic control, including but not limited <br />to providing signage, directional assistance (flaggers), police details, or any other labor and <br />equipment necessary to ensure the proper maintenance of traffic in accordance with the <br />Project Specifications and all applicable codes, regulations, and laws. <br />7.16.2 Contractor shall ensure that the Work does not impede individual or vehicular access <br />to private property throughout the duration of the Work. Contractor may propose temporary <br />facilities to ensure access to private property provided the same is approved by the City. <br />7.16.3 Contractor shall not enter upon, access, or disrupt private property. To the extent <br />that the Work may require Contractor to enter upon or access private property, the <br />Contractor shall immediately notify the City and shall not enter upon said private property <br />unless provided express permission by the City. The City shall not provide the Contractor <br />access to private property without first obtaining the private property owner's consent. <br />7.16.4 The City will provide the Contractor with Work Activity Notices (Door Hangers), <br />which Contractor shall post on affected private properties no less than two (2) days in <br />advance of planned Work affecting said properties. <br />7.16.5 Days and Hours of Work. With the exception of designated holidays or work exclusion <br />dates as determined by the City during which no construction shall be performed, the <br />construction portions of the Work shall only be performed on the following days and times: <br />Monday through Thursday, between 7:00 a.m. and Sunset; <br />Friday, 7:00 am to 5:00pm; and <br />COMTECH ENGINEERING, INC. 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.