My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />services requested by the City which are required to be provided by an Independent <br />Testing Laboratory shall be paid by the City unless otherwise stated in the Contract <br />Documents. Contractor may not rely upon any testing performed by the City or the City's <br />Representative but shall remain solely responsible for insuring compliance with all <br />Contract Documents and testing requirements. The Contractor shall be responsible for <br />the payment of any of its testing. <br />ARTICLE VIII <br />CONTRACT ADMINISTRATION <br />8.1 City's Consultant Engineer <br />8.1.1 The City's Consultant Engineer for this project is Calvin Giordano & <br />Associates. In the event the City should find it necessary or convenient to replace the <br />Consultant Engineer the City shall retain a replacement Consultant Engineer and the status <br />of the replacement Engineer shall be that of the former Engineer. <br />8.2 Ci . 's Representative <br />8.2.1 The City's Representative, unless otherwise directed by the City in writing, <br />will perform those duties and discharge those responsibilities allocated to the Engineer as <br />set forth in the Contract Documents and this Contract. The City's Representative shall be <br />the City's representative from the effective date of this Contract until final payment has <br />been made. The City's Representative shall be authorized to act on behalf of the City only <br />to the extent provided in this Contract. <br />8.2.2 The Contractor and the City's Consultant Engineer shall communicate with <br />each other in the first instance through the City's Representative. The City's designated <br />representative for the receipt of any such communications, or copies of same, is Fabricio <br />Volpi, City of Sunny Isles Beach, 18070 Collins Ave, Sunny Isles Beach, FL 33160, and <br />email fvolpi@sibfl.net. The City reserves the right to change its designated representative <br />upon written notice to the Contractor and City's Representative. <br />8.2.3 The City's Consultant Engineer shall be the initial interpreter of the <br />requirements of the drawings and specifications and the judge of the performance there <br />under by the Contractor. The Engineer, through the City's Representative, shall render <br />written or graphic interpretations necessary for the proper execution or progress of the <br />Work with reasonable promptness on request of the Contractor. <br />8.2.4 The City's Representative will review the Contractor's Payment Requests and <br />will certify to the City for payment to the Contractor, those amounts then due the Contractor <br />as provided in this Contract. <br />8.2.5 The City's Representative shall have authority to reject Work which is <br />defective or does not conform to the requirements of this Contract. If the City's <br />Representative deems it necessary or advisable, the City's Representative shall have <br />authority to require additional inspection or testing of the Work for compliance with <br />Contract requirements. In the event additional inspections or testing are required pursuant <br />COMTECH ENGINEERING, INC. 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.