My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />to this paragraph 8.2.5, the costs for all additional inspections or testing shall be the <br />responsibility for the Contractor. <br />8.2.6 The City's Representative will review and approve, or take other appropriate <br />action as necessary, concerning the Contractor's submittals including Shop Drawings, <br />Product Data, and Samples. Such review, approval or other action shall be for the sole <br />purpose of determining conformance with the Contract Documents. <br />8.2.7 The City's Representative will prepare Change Orders and may authorize <br />minor changes in the Work upon approval from the City by Field Order as provided <br />elsewhere herein. <br />8.2.8 The City's Representative shall, upon written request from the Contractor, <br />conduct inspections to determine the date of Substantial Completion and the date of Final <br />Completion, will receive and forward to the City for the City's review and records, written <br />warranties and related documents required by this Contract and will issue a final Certificate <br />for Payment upon compliance with the requirements of this Contract. <br />8.2.9 The Contractor agrees, acknowledges, and warrants that it has no third parry <br />beneficiary rights, or other rights, arising out of any contract by and between the City, the <br />City's Representative, and/or the City's Consultant Engineer and, in the event of any <br />conflict between the terms and provisions of the contract by and between the City and the <br />City's Representative, and/or the City's Consultant and this Contract, the terms of this <br />Contract shall control with respect to the Contractor. <br />8.2.10 If the Contractor fails any inspection which requires a re -inspection by <br />the City's Representative or any of its consultants, the Contractor shall bear the cost of <br />such repeat inspection(s) which cost may be deducted by the City from any sums otherwise <br />due the Contractor. <br />8.3 Claims by the Contractor <br />8.3.1 Except as prohibited in Paragraph 8.3.5.1 herein below, all Contractor claims <br />shall be initiated by written notice and claim to the City and the City's Representative, as <br />applicable. <br />Such written notice and claim must be furnished within three (3) days after occurrence of <br />the event, or the first appearance of the condition giving rise to the claim. <br />8.3.2 Pending final resolution of any claim of the Contractor, the Contractor shall <br />diligently proceed with performance of this Contract and the City shall continue to make <br />payments to the Contractor in accordance with this Contract. The resolution of any claim <br />under this Paragraph 8.3 shall be reflected by a Change Order executed by the City, the <br />City's Representative, and the Contractor. <br />8.3.3 Claims for Concealed and Unknown Conditions -- Should concealed and <br />unknown conditions encountered in the performance of the Work (a) below the surface of <br />the ground or (b) in an existing structure be at variance with the conditions indicated <br />COMTECH ENGINEERING, INC. 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.