My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />Representative for review. Percentage for overhead and profit shall be <br />determined in accordance with the method listed described under Overhead <br />and Profit below. <br />10.3.3.3 By a Cost -Plus Price on total actual costs, plus an added <br />percentage, all determined as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a) Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required for <br />the Work shall be just and fully compensated for by adding an amount equal to <br />FIVE PERCENT (5%) of the sum of material and labor costs as defined under <br />Subcontractor's profit below, but excluding documented equipment rental costs. <br />(b) Subcontractor's profit may then be added to the above material costs <br />and labor costs including the Overhead allowance at the rate of SEVEN <br />PERCENT (7%) of the sum of those costs, excluding equipment rental costs. <br />(c) Contractor's overhead, including general supervision and the furnishing, <br />use and maintenance of small tools incidental to and required for the Work <br />accomplished by its own direct labor shall be considered to be just and fully <br />compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />sum of material and labor costs as defined under Material costs and Labor costs <br />below, but excluding equipment rental costs and bond allowance. <br />(d) Contractor's overhead, including general supervision and the furnishing, <br />use and maintenance of small tools and equipment incidental to and required <br />for the Work accomplished by subcontractors shall be considered to be just and <br />fully compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />sum of material and labor costs as defined under Material costs and Labor costs <br />below, but excluding equipment rental costs and bond allowance. <br />(e) Contractor's profit may then be added into the above material costs and <br />labor costs, including the Overhead allowance at the rate of SEVEN PERCENT <br />(7%) of the sum of those costs, excluding equipment rental costs. <br />10.3.3.5 Bond Allowance: For maintaining the Public Construction Bond at <br />100% of the Contract Price, a sum of ONE PERCENT (1%) of the total cost of <br />the change (including material, labor, overhead and profit, and equipment rental) <br />shall be allowed on all change orders. <br />10.3.3.6 Material costs actually recorded by the Contractor and the <br />subcontractor as materials are delivered to the site and, as evidenced from <br />originally receipted invoices, listing appropriate quantities and unit prices. <br />Records in proper form shall be maintained and made available to the City's <br />Representative and the City at all times. <br />COMTECH ENGINEERING, INC. 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.