Laserfiche WebLink
DEMOLITION/ CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS 2019 <br />II. Demolition Work/Excavation and Grading/Concrete Placement Work <br />Contractor Information: Please include name, company, address, phone number, <br />email, cell phone number. <br />Demolition Contractor has not been determined as of this application. <br />Project Location: 19051 Collins Avenue, Sunny Isles Beach, FL 33160 <br />Estimated Start Date: February 2026 <br />Estimated Completion Date: May 2026 <br />Hours of Operation: Construction hours mandated by City of Sunny Isles Beach, plus certain <br />extended hours, as requested, and approved by the City. <br />Project Task. Describe project; include equipment to be used. <br />Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional <br />insured. Project is demolition of existing structure and construction of new condo. Insurance <br />Certificates will be provided with City of Sunny Isles Beach listed as an additional <br />insured. <br />Additional Information (as applicable to project) <br />Truck Route: Describe truck routes (attach route map), include number of trucks and <br />staging location. Refer to Attachment "A" - Construction Staging Plan <br />and Traffic Management Plan (Drawing LG-1). <br />Material Storage Location: Describe the location for material storage (if needed). Any <br />removal or relocation of sand, must be approved separately. <br />To Be Determined. <br />Construction Trailer. Will a construction trailer be used? If so, show location? <br />No, an onsite construction trailer will not be required. <br />Traffic Control: Will this operation require occupying any traffic lanes, parking lanes, <br />beachwalks or any other public right -of way? If yes, closures shall be per the regulations <br />described in the Maintenance of Traffic (MOT) from the Florida Department of <br />Transportation (FDOT). Please note that a Lane Closure Permit from the Code <br />Compliance Department must be obtained prior to public right-of-way use. <br />No lane closures are expected during demolition <br />activities. Lane closures are expected for the installation <br />of proposed utilities and required approvals and lane <br />closure permit will be obtained prior to public <br />right-of-way use. <br />318 <br />