Laserfiche WebLink
DEMOLITION/ CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS 2019 <br />Parking: Indicate the number of workers and the areas where their vehicles will be parked <br />through the duration of this phase of the project. Any parking displacement must be <br />addressed accordingly and in advance. <br />Parking arrangement will be made with a third -party transportation bus company and the use of <br />Clean uper—egcriegtlaieHmeasures riNat' wIfkbe taken to ensure that the work site and <br />public right-of-way will be maintained (including dust control, swale on driveways to <br />prevent water leaks to the street, gutter buddies, rocks at driveways, etc.) <br />The stabilized construction exit shall be maintained in a condition that will prevent the tracking or flow of mud onto public right-of-way. This may require periodic maintenance as conditions <br />demand, and the repair and/or clean out of any structures used to trap ',sediments. All materials spilled, dropped, washed, or tracked from vehicles onto roadways or into storm drains must <br />be removed immediat ly. Sweep the paved roa as needed. Refer to Co struction Soil Erosion and Sediment Control Plan here as "Alta hment B" (Sheet 100). <br />Fencing: Mnstructjon rencrng must be constructed of durable material and additional <br />silt fencing for additional protection. Gates should be steady and properly secure during <br />non -working hours. <br />Stormwater Pollution Prevention Plan (SWPP): The Plan must include a site <br />evaluation of how and where pollutants may be mobilized by stormwater, must include a <br />site plan for managing stormwater runoff identifying the stormwater exit areas, must <br />identify appropriate erosion and sediment controls and stormwater best practices to <br />reduce erosion, sedimentation, and stormwater pollution. A maintenance and inspection <br />schedule plan must be provided as part of the SWPP. <br />Provide erosion sediment control plans, if applicable. <br />Refer to Construction Soil Erosion and Sediment Control Plan here as "Attachment B" <br />(Sheet C-100). <br />M <br />319 <br />