My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 26-Z-221
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2026
>
Zoning Resolution 26-Z-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 11:53:50 AM
Creation date
3/17/2026 12:05:20 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
26-Z-221
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Site Plan Appl (PZ2025-08) MB RE Investments, LLC for "Miami Beach Club" (62) Story Residential Condo Tower w/ 524,212.8 Sq. Ft of FAR.
Supplemental fields
Comment
Heard with Companinon Reso No.: 2026-3963; Item 9A.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION/ CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS 2019 <br />IV. Public' Sidewalk/Beach Access Closure <br />Contractor Information: Please include name, company, address, phone number, <br />email, cell phone number. <br />Same as previous information for Construction (See Response to Section <br />II on previous pages. <br />Project Location: Same as previous information for Construction (See Response to Section <br />II on previous pages. <br />Estimated Start Date: <br />Estimated Completion Date: <br />Same as previous information for Construction (See Response to Section <br />Hours of Operation: 11 on previous pages. <br />Project Task. Describe how and what will be demolished; include equipment to be used. <br />Note: Copy of liability insurancV with the City of Sunny Isles Beach as an additional <br />insured. <br />Adjacent beach access available for public access: Signage, location, hours of <br />operations, etc. Walkway protection details. <br />Public sidewalk access: Signage, location, hours of operations, etc. Protection detail. <br />Closure of sidewalks. <br />Clean-up and maintenance: Describe the measures that will be taken to ensure that <br />the work site and public right-of-way will be maintained (including dust control) <br />51 <br />321 <br />
The URL can be used to link to this page
Your browser does not support the video tag.