Laserfiche WebLink
LMS 2025-2030 <br />PART 1: THE STRATEGY <br />between the capacity of public infrastructure in relation to proposals of private de- <br />velopment. RER also ensures all proposed development in the municipality con- <br />forms to the comprehensive plans as it relates to urban design of public areas, and <br />buildings, infrastructure planning and maintenance of flood data and other statisti- <br />cal information. <br />Municipal Planning and Development Department: This is often a part of the <br />building department and at times, a part of public works. However, several of our <br />municipalities maintain planning and development as a separate entity which in- <br />teracts with the mitigation strategy in many ways and must be involved in the LMS <br />especially in urban land use. <br />Public Works Department: In most of our cities this department is responsible for <br />construction and maintenance of roads, bridges, waterways, and storm water man- <br />agement including drainage system development, inspection, and maintenance. <br />All these functions relate in various ways to hazard mitigation. Public works activ- <br />ities are a major component of any mitigation strategy. <br />P 1-23 <br />