Laserfiche WebLink
Residences by Armani/CASA I D C U <br /> 18975 Collins Avenue <br /> APR - 62015 ) <br /> Construction Cost — p z .o/h _ 06 <br /> 3/25/15 <br /> PLANNING & ZONING DEPT. <br /> • <br /> Construction Cost Estimate $ 230,597,640.00 <br /> 1 % of Construction Cost $ 2,305,976.40 <br /> Total Value of Art Cap: $ 500,000.00 <br /> Value of Art Proposed: TBD <br /> - - Schematic Estimate <br /> Item DfXrIPt1On February 11.2015 <br /> • <br /> _ .230,597,640 <br /> SITEWORK 12.553,790 <br /> CONCRETE WORK 58,552.554 <br /> MASONRY 2,345250 <br /> METALS 92.1,700 <br /> CARPENTRY 8,574868 <br /> THERMAL/MOISTURE PROTECTION •2,736.313 <br /> DOORS&WINDOWS 33,239,375 <br /> FINISHES 21,695.507 <br /> SPECIALTIES 5,348,455 <br /> EQUIPMENT 6,218,1700 <br /> FURNISHINGS NEC., <br /> SPECIAL CONSTRUCTION 4,417,700 <br /> CONVEYING SYSTEMS 6,915.000 <br /> PLUMBING '10,079,966 <br /> FIRE PROTECTION 2,698.522 <br /> HVAC 9,418,996 <br /> ELECTRICAL&SYSTEMS 12.697,691 <br /> SUBTOTAL 198,446,986 4 <br /> General Conditions 10,901.336 <br /> General Requirements 3954,069 <br /> Subcontractor Delautt Irsunnce(SDI) 2312,770 <br /> COP Program 2.454.215 <br /> Other liability Inswance "859.651" <br /> tscatation TBD <br /> SUBTOTAL - '219,329,027 <br /> Overhead&Fee 8,773,161 <br /> SUBTOTAL 225,102,1W <br /> Payment 6 Performance Bond - 1,995.451 <br /> warranty/558 Process 500,030 <br /> Contractor Conatrucuon Contingency TBD <br /> CURRENT PROJECT TOTAL 5230,597,640 <br />