Laserfiche WebLink
- _ _-, - • <br /> Addendum}No:.3 Bidder Questions and Responses f� <br /> - • .NE 174'STREET ROADWAY IMPROVEMENTS <br /> . = GTY REP No.14-11-01 _ _ <br /> 26+00 approx.). The existing shelters needs to be removed and salvaged to the City? <br /> Please advise. <br /> Response: Installation of bus shelters does mean furnish and install. The Contractor shall <br /> be responsible for coordinating with the Bus shelter provider for provision of any and all <br /> engineering services required for installation of the proposed shelters. Existing benches <br /> and trash bins are to be protected and reinstalled. All shelters removed from within the <br /> project area shall be hauled away by the successful Contractor to the City's Public Works <br /> facility located beneath the William Lehman Causeway. <br /> 11. Under Section 5 Qualifications, it references proposer's relevant experience. Should <br /> experience in coastal projects be a requirement to qualify? <br /> Response: It is not a requirement. However,such experience would be looked upon as a <br /> plus though it will not be the determining factor. <br /> > Please be advised that Civil plan sheets C-14 to C-16 and C-30 have been revised. <br /> RER permit Number CLII-20140027 for the project has been included herein. <br /> > Landscape and Irrigation Plan sheets have been revised and are included as part of this RFC for <br /> contractor reference. <br /> > A revised bid form has been provided. <br /> • <br /> END OF SECTION <br /> • <br /> 3 <br />