My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2401
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2015 10:06:03 AM
Creation date
5/21/2015 10:05:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2401
Date (mm/dd/yyyy)
04/16/2015
Description
Award Bid 14-11-01 & Agmt w/Florida Engineering & Development for 174th St Roadway Improve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ _ <br /> — — - - - _ Addendum No 3-Bidder Questions and Responses - <br /> - - _ - NE 174M STREET ROADWAY IMPROVEMENTS= <br /> CITY RFP No.14-11-01. <br /> you please advise how much muck removal will be required when it is encountered—30- <br /> inches, 36-inches, complete removal,etc. <br /> Response:Please refer to Attachment B and Technical Specifications provided. <br /> 6. Bid Proposal Form: Is the bid proposal form available in either excel or word format? <br /> Response:No. However, those with Adobe writer should be able to copy and convert the <br /> table to an Excel sheet for their in-office use. The bid shall be submitted in the form <br /> provided by the City.Any attempt to alter, modify, or enhance this form may result in a <br /> disqualification of your bid. <br /> 7. Off-Duty Officers: Please add an allowance line item for off-duty officer, since the <br /> requirement for this service is unknown at this time. <br /> Response: The estimated cost per hour has been provided in the RFP. The need for off- <br /> duty police support is at the sole discretion of each prospective bidder based on their <br /> proposed construction methodology and MOT plan to be implemented. Bidders are <br /> advised to carefully consider these factors and make the necessary allowances within the <br /> line item provided for Maintenance of Traffic currently provided in the bid form.Note that <br /> all road closures,full and partial,shall require coordination with first responder services. <br /> 8. In reading the Bid Proposal Form Page 36 Notes,the note seems to indicate that it is both <br /> a lump sum project and unit price project. Could you please clarify whether this will be <br /> a unit price project, lump sum project or Guaranteed Maximum Price? <br /> Response: The bid has unit prices as well as lump sum prices. Lump sum prices are fixed <br /> and unit prices can have over or under-runs. Furthermore,payment for pipe will be based <br /> on field measured-installed quantities;from inside wall to inside wall. <br /> 9. On the summary of the Prebid meeting,the City is requesting an Off-Duty Police Officers <br /> but the Contractor does not know,when,where, how many and how much time the city <br /> will request it. It is very difficult to calculate the number of hours and some Contractors <br /> assumes a few and others a lot.We believe that is fair that the City include an item with <br /> an Allowance or Estimate a number of man hours for Police Officers and use them a <br /> discretion of the City, thereby everybody is in the same page . <br /> Response: See response to item no. 7. <br /> 10. The Item # 74 says, "Installation of Bus Shelters...." ( C-31 ). That means, Furnish and <br /> Install, right? And reinstall the existing benches and waste trash, right? (Sta 36+00 and <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.