My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
BEA Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2015 11:18:58 AM
Creation date
6/5/2015 11:12:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RELEVANT EXPERIENCE <br />Firm’s Name:Laura Llerena & Associates, Inc. <br />Client’s Name: KVH Architects <br />Project Name:Crandon Park Marina <br />Project Cost:$3.5 million <br />Our Fees: $33,500.00 <br />Project Start Date:2007 <br />Completed 2014 <br />Type of Services:Full Landscape Design Services <br />Project Description: This project consisted of the improvement and beautification <br />of the Crandon Park Marina. Crandon Boulevard has <br />extensive landscaping so it was the intent of the owner to <br />create the same tropical and welcoming impact for this <br />project. Prior to the start of design work our office performed <br /> a thorough site analysis in where we identified and sized all <br />existing trees and where we identified areas of concern and <br />potential. Considering the amount of trees on the site it was <br />our intent to keep and utilize as many of them as <br />possible. Those that had to be removed or relocated had to <br />be permitted through DERM. In addition our scope also <br />included preparation of landscape and irrigation design <br />development documents through construction <br />documents. Several coordination meetings were also held <br />throughout the design process. Construction administration <br />services were also provided. <br /> <br />Name of Key Individuals <br />Involved in the Project:Laura M. Llerena-Hernandez, Principal <br />Jason Korose, Senior Project Manager <br />Contact:Ms. Caridad Hidalgo-Gato <br /> KVH Architects <br /> 3900 NW 79 Avenue <br /> Miami, Fl 33166 <br /> (305)599-5296 <br /> <br /> 62 |
The URL can be used to link to this page
Your browser does not support the video tag.